PSERC · Punjab State Electricity Regulatory Commission
Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 3rd Amendment, 2026 — Order
Punjab State Electricity Regulatory Commission (Electricity Supply Code, Standards of Performance and Related Matters) (3rd Amendment) Regulations, 2026
OrderDated 2 Jul 2026
Read with the Electricity Supply Code, Standards of Performance and Related Matters Regulations, 2024.
Summary
Summary written by software, from pages 1 to 28 of 82. Check the regulator's original before you rely on it.
This document is PSERC's order dated 02.07.2026 on the draft Punjab State Electricity Regulatory Commission (Electricity Supply Code, Standards of Performance and Related Matters) (3rd Amendment) Regulations, 2026. It records the consultation process — draft notification, comments by 15.06.2026, public hearing on 17.06.2026, ten objectors and PSPCL's reply memo dated 26.06.26 — and then goes clause by clause through the proposed changes, stakeholder objections, PSPCL's comments, and the Commission's analysis and decisions (p1).
The operative parts amend the 2024 Supply Code. Regulation 11's proviso is substituted for domestic connections outside village Phirni where the service line exceeds 500 meters, making the applicant pay variable charges for the additional length plus fixed connection charges on kW basis (p2). Regulation 12 is amended to give distribution licensees load-assessment norms for planning colony/complex LD systems: tables cover residential plots and flats, group housing, shops/showrooms/office space, common services, EV charging, sewage treatment and firefighting, hotels/malls, and industrial complexes/IT parks (pp2–3). It also sets land contribution thresholds for grid substations in large colonies — 1500 sq yd for loads above 10 MVA up to 50 MVA and 3000 sq yd above 50 MVA, with right of way (pp5–7). Objectors attacked the draft's retrospective application from 14.11.2024; the Commission modified the loading norms and the 3000 sq yd land provision to apply to NOCs issued on or after publication of these amendment regulations, and directed consequential Model Agreement changes (pp5–7).
Regulation 13 amendments cover single-point-supply colonies and franchisees. The Commission retains a minimum contract demand of 50% of the partial load for partial connectivity, with 70% for full connectivity, applicable from commencement of these regulations (p15). It allows existing pre-2024 franchisees to keep dual source energy meters on revised NOC subject to safeguards for subsidy and rooftop SPV rights, and deletes the last sentence of Model Agreement Clause 13(v) (pp19–20). It substitutes the performance-guarantee provision for single-point supply — a bank guarantee equivalent to 10% of estimated LD system cost — and deals with old franchisee agreements being substituted by the Model Agreement.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 27 Feb 2026Supply Code Review Panel Constitution Notification, 2026
- Dated 17 Mar 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 1st and 2nd Amendment, 2026 — Order
- Dated 25 Mar 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 2nd Amendment Regulations, 2026 — Order
Procedures and orders made under it
Consolidated copies, for reference (1)
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.