PSERC · Punjab State Electricity Regulatory Commission
Electricity Supply Code, Standards of Performance and Related Matters Regulations, 2024
Punjab State Electricity Regulatory Commission (Electricity Supply Code, Standards of Performance and Related Matters) Regulations, 2024
RegulationDated 23 Oct 2024Published in the Gazette 24 Oct 2024In force from 14 Nov 2024No. PSERC/Secy./Regu.191 dated The 23rd October, 2024
3 amendments to it are on Voltaic, the latest dated 3 Jul 2026.
Summary
Summary written by software, from pages 1 to 29 of 163. Check the regulator's original before you rely on it.
The Punjab State Electricity Regulatory Commission issued this principal regulation by Notification No. PSERC/Secy./Regu.191 dated 23 October 2024, published in the Chandigarh Extraordinary Gazette on 24 October 2024 and brought into force from 14 November 2024 (p1). It applies to all licensees under the Electricity Act, including entities exempted under Section 13, in their licensed/supply areas, and to all consumers and persons in Punjab (p1). It is made under Section 181 read with a long list of supply, theft and enforcement sections, and in compliance with the Electricity (Removal of Difficulties) Order, 2005 and the Electricity (Rights of Consumers) Rules, 2020 (p1).
Chapter I (p1-11) sets short title, extent and commencement, defines the Code's vocabulary, and gives interpretation rules (p2-9). It creates a Supply Code Review Panel with Commission, State Government, licensee, STU/transmission, SLDC and consumer representatives, sets its functions and review process, and lays down how the Code may be amended, notified in the Gazette and placed on websites (p9-11).
Chapter II (p12-14) specifies the system of supply: frequency, declared LT/HT/EHT voltages, the supply-voltage table linking consumer load categories to voltage levels, exceptions where lower or higher voltage supply is allowed with surcharge, and classification of consumers to be only as approved by the Commission in tariff orders (p12-14).
Chapter III (p15-29) is the operative supply procedure. It imposes the distribution licensee's duty to supply on request, subject to feasibility and charges, with exceptions for events beyond control and statutory clearances, and compensation for delay under Annexure-4 (p15-17). It covers security requirements, resale prohibition and separate EV charging connections (p17-18); general terms for published procedures, forms, web portal/mobile app and Aadhaar verification (p18-19); computation of connected load and contracted load declaration (p19-20); registration of applications for load up to 2000 kVA and the feasibility-clearance route above 2000 kVA (p20-22); documents and NOCs (p22-24); and acceptance of A&A forms, seniority, demand notices, their timelines, validity and extension/revival rules including for AP connections (p24-29). The pages refer to Annexure-1, Annexure-4 and the Schedule of General Charges.
Read with this
Amendments and corrections
Commencement notices and reasons
- Dated 27 Feb 2026Supply Code Review Panel Constitution Notification, 2026
- Dated 17 Mar 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 1st and 2nd Amendment, 2026 — Order
- Dated 25 Mar 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 2nd Amendment Regulations, 2026 — Order
- Dated 2 Jul 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 3rd Amendment, 2026 — Order
Procedures and orders made under it
Consolidated copies, for reference (1)
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.