PSERC · Punjab State Electricity Regulatory Commission
Electricity Supply Code, Standards of Performance and Related Matters Regulations, 2024
Punjab State Electricity Regulatory Commission (Electricity Supply Code, Standards of Performance and Related Matters) Regulations, 2024
Consolidated copyDated 23 Oct 2024In force from 14 Nov 2024No. PSERC/Secy./Regu.191 dated The 23rd October, 2024
A consolidated copy of the Electricity Supply Code, Standards of Performance and Related Matters Regulations, 2024, published by PSERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software, from pages 1 to 27 of 176. Check the regulator's original before you rely on it.
PSERC's Supply Code, 2024 is the Punjab Commission's principal regulation for electricity supply, standards of performance and related matters (p1, p4). It was issued as Notification No. PSERC/Secy./Regu.191 dated 23 October 2024 and comes into force on 14 November 2024 (p4). It applies to all licensees under the Electricity Act 2003 — including entities exempted under Section 13 — in their licensed/supply areas, and to all consumers/persons in Punjab (p4). The notification cites Section 181 read with a long list of Act sections and compliance with the Ministry of Power removal-of-difficulties order and the Electricity (Rights of Consumers) Rules, 2020 (p4).
The pages cover the opening of the Code. The index maps the full 69-regulation and 10-annexure structure, including later provisions on single-point supply, temporary supply, metering, billing, disconnection, theft, standards of performance and grievance redressal (p2–3). Chapter I (Regulations 1–4) gives title, extent and commencement; defines central terms; sets interpretation rules; and creates the Supply Code Review Panel and amendment process (p4–13). Chapter II (Regulation 5) sets the system of supply, voltage levels and a supply-voltage/consumer-category matrix, plus classification by tariff category (p14–16). Chapter III (Regulations 6 onwards) covers the distribution licensee's duty to supply, general terms, connected-load computation and contracted-load declaration, application registration, document requirements, and the start of acceptance/demand-notice procedure; the index shows it continuing into load release, security, recovery, metering and related matters (p17–27).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 27 Feb 2026Supply Code Review Panel Constitution Notification, 2026
- Dated 17 Mar 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 1st and 2nd Amendment, 2026 — Order
- Dated 25 Mar 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 2nd Amendment Regulations, 2026 — Order
- Dated 2 Jul 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 3rd Amendment, 2026 — Order
Procedures and orders made under it
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.