Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Electricity Supply Code, Standards of Performance and Related Matters Regulations, 2024

Punjab State Electricity Regulatory Commission (Electricity Supply Code, Standards of Performance and Related Matters) Regulations, 2024

Consolidated copyDated 23 Oct 2024In force from 14 Nov 2024No. PSERC/Secy./Regu.191 dated The 23rd October, 2024

A consolidated copy of the Electricity Supply Code, Standards of Performance and Related Matters Regulations, 2024, published by PSERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software, from pages 1 to 27 of 176. Check the regulator's original before you rely on it.

PSERC's Supply Code, 2024 is the Punjab Commission's principal regulation for electricity supply, standards of performance and related matters (p1, p4). It was issued as Notification No. PSERC/Secy./Regu.191 dated 23 October 2024 and comes into force on 14 November 2024 (p4). It applies to all licensees under the Electricity Act 2003 — including entities exempted under Section 13 — in their licensed/supply areas, and to all consumers/persons in Punjab (p4). The notification cites Section 181 read with a long list of Act sections and compliance with the Ministry of Power removal-of-difficulties order and the Electricity (Rights of Consumers) Rules, 2020 (p4).

The pages cover the opening of the Code. The index maps the full 69-regulation and 10-annexure structure, including later provisions on single-point supply, temporary supply, metering, billing, disconnection, theft, standards of performance and grievance redressal (p2–3). Chapter I (Regulations 1–4) gives title, extent and commencement; defines central terms; sets interpretation rules; and creates the Supply Code Review Panel and amendment process (p4–13). Chapter II (Regulation 5) sets the system of supply, voltage levels and a supply-voltage/consumer-category matrix, plus classification by tariff category (p14–16). Chapter III (Regulations 6 onwards) covers the distribution licensee's duty to supply, general terms, connected-load computation and contracted-load declaration, application registration, document requirements, and the start of acceptance/demand-notice procedure; the index shows it continuing into load release, security, recovery, metering and related matters (p17–27).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Conditions of supply, Standards of performance, New connections and load changes

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document