CERC · Central Electricity Regulatory Commission
Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022 — First Amendment, 2025 — Draft
Central Electricity Regulatory Commission (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) (First Amendment) Regulations, 2025
Draft amendmentDated 22 Sep 2025No. RA-14026(11)/1/2022-CERC dated 22nd September, 2025
Draft
A proposal that has since been finalised as the Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a CERC draft amendment that would introduce a First Amendment to the 2022 REC Regulations (p1). It opens with the short title and commencement clause: the amendments take effect on Gazette publication, a date not printed (p1). Regulation 2 gets three new definitions — Designated Consumer, Renewable Consumption Obligation (RCO) and Virtual Power Purchase Agreement (VPPA) — tying RCO to the Energy Conservation Act, 2001 and VPPA to the CERC Power Market Regulations, 2021 (p1–2).
Eligibility is widened: Regulation 4(3) is amended to cover renewable captive generating stations with self-consumption that do not meet the Electricity Rules, 2005 captive conditions (p2). Regulation 10(3) is replaced to require an eligible distribution licensee or open access consumer to apply for Certificates within three months of State Commission certification of RE purchase above its RPO, with no certificates beyond that period (p2).
Regulation 12 is recast. Certificate multipliers are split by commissioning date: stations commissioned after 05.12.2022 and before the amendment's effective date get table values; those commissioned afterwards follow the new Appendix-1 (p3). Other technologies' multipliers are to be set case-by-case by the Commission on Appendix-1 principles (p3). Assigned multipliers have a fixed validity from commissioning, after which one Certificate is issued per MWh (p4).
A new Regulation 14A governs VPPAs: certificates transfer to the consumer or designated consumer, can meet RPO/RCO, are extinguished once used but surplus can be carried forward for future compliance and cannot be sold on power exchanges or through traders; the generating station must inform the Central Agency, which extinguishes used certificates and updates records (p4–5).
Finally, Appendix-1 is substituted with the principles and weighted scoring for determining certificate multipliers across tariff range, technology maturity and capacity credit/peak support, plus a technology-wise multiplier table (p5–7).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 11 Jun 2022Renewable Energy Certificates Regulations, 2022 — Statement of Reasons
- Dated 31 Oct 2022REC Regulations 2022 — commencement notification, effective 05.12.2022
- Dated 31 Oct 2022REC Regulations, 2022 — Commencement Notification
Other copies of these documents (2)
Earlier drafts
- Dated 15 Feb 2022Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022 — Draft
- Dated 15 Feb 2022Notice extending the date for comments: Draft Renewable Energy Certificates Regulations, 2022 — Public Notice
- Released with the draft dated 15 Feb 2022Explanatory memorandum: Draft REC Regulations, 2022 — Explanatory Memorandum
- Dated 15 Mar 2022Notice extending the date for comments: Renewable Energy Certificates Regulations, 2022 — Public Notice — Extension of Comments Deadline and Public Hearing
- Released with the notice dated 22 Sep 2025Explanatory memorandum: REC (First Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
- Dated 22 Sep 2025Public notice: Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, 2025 — Public Notice — Draft
- Dated 5 Dec 2025Hearing notice: Renewable Energy Certificates for Renewable Energy Generation, 2025 — First Amendment — Public Hearing Notice, 22.12.2025
- Dated 18 Dec 2025Hearing notice: Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, 2025 — rescheduled public hearing notice, 29.12.2025
2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.