Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022 — First Amendment, 2025 — Draft

Central Electricity Regulatory Commission (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) (First Amendment) Regulations, 2025

Draft amendmentDated 22 Sep 2025No. RA-14026(11)/1/2022-CERC dated 22nd September, 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a CERC draft amendment that would introduce a First Amendment to the 2022 REC Regulations (p1). It opens with the short title and commencement clause: the amendments take effect on Gazette publication, a date not printed (p1). Regulation 2 gets three new definitions — Designated Consumer, Renewable Consumption Obligation (RCO) and Virtual Power Purchase Agreement (VPPA) — tying RCO to the Energy Conservation Act, 2001 and VPPA to the CERC Power Market Regulations, 2021 (p1–2).

Eligibility is widened: Regulation 4(3) is amended to cover renewable captive generating stations with self-consumption that do not meet the Electricity Rules, 2005 captive conditions (p2). Regulation 10(3) is replaced to require an eligible distribution licensee or open access consumer to apply for Certificates within three months of State Commission certification of RE purchase above its RPO, with no certificates beyond that period (p2).

Regulation 12 is recast. Certificate multipliers are split by commissioning date: stations commissioned after 05.12.2022 and before the amendment's effective date get table values; those commissioned afterwards follow the new Appendix-1 (p3). Other technologies' multipliers are to be set case-by-case by the Commission on Appendix-1 principles (p3). Assigned multipliers have a fixed validity from commissioning, after which one Certificate is issued per MWh (p4).

A new Regulation 14A governs VPPAs: certificates transfer to the consumer or designated consumer, can meet RPO/RCO, are extinguished once used but surplus can be carried forward for future compliance and cannot be sold on power exchanges or through traders; the generating station must inform the Central Agency, which extinguishes used certificates and updates records (p4–5).

Finally, Appendix-1 is substituted with the principles and weighted scoring for determining certificate multipliers across tariff range, technology maturity and capacity credit/peak support, plus a technology-wise multiplier table (p5–7).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO), Captive status

Read with this

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗