CERC · Central Electricity Regulatory Commission
Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, 2026
Central Electricity Regulatory Commission (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) (First Amendment) Regulations, 2026
AmendmentDated 24 Mar 2026No. RA-14026(11)/1/2022-CERC dated 24th March 2026
Amends the Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's first amendment to its 2022 REC regulations, issued 24 March 2026 and taking effect from Gazette publication — the Gazette date itself is not printed (p1). It widens who can earn certificates, tightens the filing window, reworks the certificate multiplier, and creates a new treatment for virtual power purchase agreements.
Paragraphs 2–3 (p1–2) amend the definitions in Regulation 2 of the Principal Regulations, adding 'Designated Consumer' (borrowed from the Energy Conservation Act, 2001), 'Renewable Consumption Obligation' or RCO (the Central Government's minimum non-fossil consumption share under that Act), and 'Virtual Power Purchase Agreement' (as defined in CERC's Power Market Regulations, 2021). Regulation 4 is amended so that renewable captive plants which do not meet the Electricity Rules, 2005 captive conditions but have self-consumption are within the eligible pool.
Paragraph 4 (p2) replaces Regulation 10(3): a distribution licensee or open access consumer must apply for certificates within three months of the concerned State Commission certifying purchases in excess of its RPO, and nothing can be issued after that window.
Paragraph 5 (p3–4) rewrites the multiplier architecture of Regulation 12. Stations commissioned after 05.12.2022 and before the date of effect of this amendment keep a fixed multiplier table by source; those commissioned later take the multipliers in the substituted Appendix-1. Technologies not covered go to case-by-case Commission orders on Appendix-1 principles. A multiplier, once assigned, holds for a fixed period from commissioning, after which one certificate issues per MWh (p4).
Paragraph 6 (p4–5) inserts Regulation 14A: certificates of a generator with a VPPA transfer to the consumer or designated consumer, that consumer may meet its RPO/RCO with them, and they are extinguished on transfer — surplus may be carried forward but not sold on power exchanges or through traders. The generator must inform the Central Agency, which extinguishes and records the certificates.
Paragraph 7 (p5–7) substitutes Appendix-1, setting scoring principles — tariff range, technology maturity, capacity credit/peak support — with fixed weights, and a resulting multiplier per technology.
Read with this
The regulation
Commencement notices and reasons
- Dated 11 Jun 2022Renewable Energy Certificates Regulations, 2022 — Statement of Reasons
- Dated 31 Oct 2022REC Regulations 2022 — commencement notification, effective 05.12.2022
- Dated 31 Oct 2022REC Regulations, 2022 — Commencement Notification
Other copies of these documents (2)
Earlier drafts
- Dated 15 Feb 2022Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022 — Draft
- Dated 15 Feb 2022Notice extending the date for comments: Draft Renewable Energy Certificates Regulations, 2022 — Public Notice
- Released with the draft dated 15 Feb 2022Explanatory memorandum: Draft REC Regulations, 2022 — Explanatory Memorandum
- Dated 15 Mar 2022Notice extending the date for comments: Renewable Energy Certificates Regulations, 2022 — Public Notice — Extension of Comments Deadline and Public Hearing
- Dated 22 Sep 2025Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022 — First Amendment, 2025 — Draft
- Released with the notice dated 22 Sep 2025Explanatory memorandum: REC (First Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
- Dated 22 Sep 2025Public notice: Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, 2025 — Public Notice — Draft
- Dated 5 Dec 2025Hearing notice: Renewable Energy Certificates for Renewable Energy Generation, 2025 — First Amendment — Public Hearing Notice, 22.12.2025
- Dated 18 Dec 2025Hearing notice: Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, 2025 — rescheduled public hearing notice, 29.12.2025
2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.