Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

Central Electricity Regulatory Commission (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022

Regulation · Gazette copyDated 9 May 2022Published in the Gazette 24 May 2022No. RA-14026(11)/1/2022-CERC dated the 9th May, 2022

The Gazette copy of the Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the CERC's 2022 renewable energy certificate framework, notified in New Delhi on 9 May 2022 and carried in the Gazette of 24 May 2022 (p1, p9). It replaces the 2010 REC Regulations and rebuilds the certificate chain from accreditation to redemption around a technology-weighted 'Certificate Multiplier' (p10, p14).

Regulations 1–2 (p10–11) give the title, defer commencement to a date to be notified in the Official Gazette, and define the actors: Central Agency, Certificate, Certificate Multiplier, eligible entity, obligated entity, State Agency, RPO and power exchange. Regulations 3–4 (p10–11) make the National Load Despatch Centre the Central Agency — with power to designate another — and list its registration, issuance, accounting, registry and settlement functions, then set eligibility: renewable generating stations, renewable captive plants, distribution licensees and open access consumers, excluding stations whose tariff is determined or adopted under s.62/s.63 or sold for RPO compliance, or that enjoy transmission or wheeling waivers.

Regulations 5–9 (p11–12) describe the three-step process and split accreditation between State Agencies (intra-State) and RLDCs (inter-State), with registration by the Central Agency, duties to report name or legal-status changes, and grounds for revocation. Regulations 10–14 (p12–15) cover issuance (application deadlines tied to generation and to the financial year, with a fixed disposal period), exchange through power exchanges or traders, redemption and extinguishment, denomination of one certificate per MWh with the multiplier table, market-discovered pricing with Commission intervention powers, and certificate validity.

Regulations 15–19 (p15) deal with fees, the Detailed Procedure the Central Agency must issue within three months, practice directions, power to relax, and repeal of the 2010 Regulations with savings for existing accreditation, registration and unredeemed certificates. Appendix-1 (p16) gives the principles for determining the multiplier.

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Power markets and exchanges, Renewable purchase obligation (RPO / RCO)

Read with this

Other copies of these documents (1)

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document