Skip to content

CERC · Central Electricity Regulatory Commission

Draft REC Regulations, 2022 — Explanatory Memorandum

Draft Central Electricity Regulatory Commission (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022

Explanatory memorandum to a draftReleased with the draft dated 15 Feb 2022

Explanatory memorandum to the Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum for the draft Central Electricity Regulatory Commission (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022. It is not the draft regulations themselves; it explains why the Commission is redesigning the REC mechanism and summarises the proposed provisions for public consultation (p1, p5).

The Background (pp2–5) traces the REC framework from the 2010 REC Regulations and the start of exchange trading in March 2011, reports registration and issuance/redemption statistics up to February 2022, and argues that falling wind/solar costs, new green market products, and a Ministry of Power request justify a redesign. The Salient Features (pp5–6) preview the main changes: NLDC remains Central Agency; eligibility is simplified; captive RE stations are brought in with restrictions on self-consumption RECs; accreditation is split between State Agencies and RLDCs; registration is given a fixed long-term validity; issuance applications face a time limit; certificates can be traded through power exchanges or electricity traders; floor and forbearance prices are removed; solar/non-solar categories are replaced by a technology multiplier; and certificate validity becomes perpetual until sale for RPO compliance.

The remaining sections give rationale and detail for each proposed area: Central Agency functions (pp7–8); eligibility conditions and exclusions (pp8–9); the continued accreditation, registration, issuance, exchange and redemption processes (pp10–13); denomination, multiplier and grandfathering, including a table of proposed multipliers by RE technology (pp13–15); market-based pricing with regulatory intervention triggers (pp15–16); perpetual certificate validity (pp16–17); fees and charges (p17); the Central Agency's detailed procedure to be issued after notification (p17); and repeal and savings for the 2010 REC Regulations and procedures (p17).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Power markets and exchanges, Electricity trading and trading margin

Read with this

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document