CERC · Central Electricity Regulatory Commission
Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022 — Draft
Central Electricity Regulatory Commission (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022
Draft regulationDated 15 Feb 2022No. RA-14026(11)/1/2022-CERC dated 15-02-2022
Draft
A proposal that has since been finalised as the Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A draft CERC notification dated 15 February 2022 (p1) proposing a new framework for renewable energy certificates, to replace the 2010 REC Regulations. It is made under s.66 and s.178 of the Electricity Act, 2003 and published for previous publication: it takes effect only from a date to be notified in the Official Gazette, which is not printed (p1).
Regulations 1–2 give the title, the conditional commencement and the defined terms (p1–3). Regulation 3 makes the National Load Despatch Centre the Central Agency, with power for the Commission to substitute another agency, and lists its functions — registration, issuance, settlement of accounts, registry and repository of transactions (p3–4). Regulation 4 sets who may receive certificates (renewable generating stations, renewable captive plants, distribution licensees and open access consumers) and the conditions that disqualify a generator — tariff determined or adopted under s.62/s.63, sale for RPO compliance through a trader or power exchange, or availing transmission/wheeling concessions or banking (p4–5); certificates from captive self-consumption cannot be sold (p5).
Regulations 5–9 establish the two-step process: accreditation (State Agency for intra-State entities, RLDC for inter-State), revocation of accreditation, registration by the Central Agency, revocation of registration, and transitional deeming of accreditations and registrations granted under the 2010 Regulations (p5–7). Regulation 10 covers applications for issuance, the application window and decision timeline, and the energy-accounting basis for issuance (p7–8). Regulation 11 governs exchange through power exchanges or electricity traders, blocking of certificates in the registry, redemption on RPO compliance and extinguishment (p8–9). Regulation 12 denominates one certificate as one megawatt hour and introduces a technology-linked Certificate Multiplier for stations commissioned after the date of effect (p9–10). Regulation 13 leaves pricing to power-exchange discovery or mutual agreement, with Commission power to intervene where prices or volumes become abnormal (p11). Regulation 14 makes certificates valid until redeemed, with clawback and penal interest where accreditation or registration was obtained on false information (p11). Regulation 15 leaves fees and charges to Commission determination (p11); Regulation 16 requires the Central Agency to frame a Detailed Procedure within three months after stakeholder consultation (p12). Regulations 17–19 give the Commission power to issue practice directions and to relax provisions, and repeal the 2010 Regulations with savings (p12–13). Appendix-1 states the principles and tariff-band basis for assigning the Certificate Multiplier (p14).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 11 Jun 2022Renewable Energy Certificates Regulations, 2022 — Statement of Reasons
- Dated 31 Oct 2022REC Regulations 2022 — commencement notification, effective 05.12.2022
- Dated 31 Oct 2022REC Regulations, 2022 — Commencement Notification
Other copies of these documents (2)
Earlier drafts
- Dated 22 Sep 2025Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022 — First Amendment, 2025 — Draft
- Released with the notice dated 22 Sep 2025Explanatory memorandum: REC (First Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
- Dated 22 Sep 2025Public notice: Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, 2025 — Public Notice — Draft
- Dated 5 Dec 2025Hearing notice: Renewable Energy Certificates for Renewable Energy Generation, 2025 — First Amendment — Public Hearing Notice, 22.12.2025
- Dated 18 Dec 2025Hearing notice: Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, 2025 — rescheduled public hearing notice, 29.12.2025
- Dated 15 Feb 2022Notice extending the date for comments: Draft Renewable Energy Certificates Regulations, 2022 — Public Notice
- Released with the draft dated 15 Feb 2022Explanatory memorandum: Draft REC Regulations, 2022 — Explanatory Memorandum
- Dated 15 Mar 2022Notice extending the date for comments: Renewable Energy Certificates Regulations, 2022 — Public Notice — Extension of Comments Deadline and Public Hearing
2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.