Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022 — Draft

Central Electricity Regulatory Commission (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022

Draft regulationDated 15 Feb 2022No. RA-14026(11)/1/2022-CERC dated 15-02-2022

Draft

A proposal that has since been finalised as the Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A draft CERC notification dated 15 February 2022 (p1) proposing a new framework for renewable energy certificates, to replace the 2010 REC Regulations. It is made under s.66 and s.178 of the Electricity Act, 2003 and published for previous publication: it takes effect only from a date to be notified in the Official Gazette, which is not printed (p1).

Regulations 1–2 give the title, the conditional commencement and the defined terms (p1–3). Regulation 3 makes the National Load Despatch Centre the Central Agency, with power for the Commission to substitute another agency, and lists its functions — registration, issuance, settlement of accounts, registry and repository of transactions (p3–4). Regulation 4 sets who may receive certificates (renewable generating stations, renewable captive plants, distribution licensees and open access consumers) and the conditions that disqualify a generator — tariff determined or adopted under s.62/s.63, sale for RPO compliance through a trader or power exchange, or availing transmission/wheeling concessions or banking (p4–5); certificates from captive self-consumption cannot be sold (p5).

Regulations 5–9 establish the two-step process: accreditation (State Agency for intra-State entities, RLDC for inter-State), revocation of accreditation, registration by the Central Agency, revocation of registration, and transitional deeming of accreditations and registrations granted under the 2010 Regulations (p5–7). Regulation 10 covers applications for issuance, the application window and decision timeline, and the energy-accounting basis for issuance (p7–8). Regulation 11 governs exchange through power exchanges or electricity traders, blocking of certificates in the registry, redemption on RPO compliance and extinguishment (p8–9). Regulation 12 denominates one certificate as one megawatt hour and introduces a technology-linked Certificate Multiplier for stations commissioned after the date of effect (p9–10). Regulation 13 leaves pricing to power-exchange discovery or mutual agreement, with Commission power to intervene where prices or volumes become abnormal (p11). Regulation 14 makes certificates valid until redeemed, with clawback and penal interest where accreditation or registration was obtained on false information (p11). Regulation 15 leaves fees and charges to Commission determination (p11); Regulation 16 requires the Central Agency to frame a Detailed Procedure within three months after stakeholder consultation (p12). Regulations 17–19 give the Commission power to issue practice directions and to relax provisions, and repeal the 2010 Regulations with savings (p12–13). Appendix-1 states the principles and tariff-band basis for assigning the Certificate Multiplier (p14).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO), Power markets and exchanges

Read with this

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.