HPERC · Himachal Pradesh Electricity Regulatory Commission

Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2017

RegulationDated 16 Nov 2017In force from 1 Oct 2017No. HPERC/428- dated 16th November, 2017

8 amendments to it are on Voltaic, the latest dated 24 Jun 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software, from pages 1 to 29 of 37. Check the regulator's original before you rely on it.

This is HPERC's principal tariff regulation for renewable energy generation in Himachal Pradesh, notified at Shimla on 16 November 2017 (p1). It replaces the control-period framework of the 2012 RE Regulations, which ran to 30 September 2017, and applies from 1 October 2017 until 31 March 2020 unless reviewed earlier or extended (p1). It is made under sections 61, 62(1), 86(1)(a)(b)(e) and 181(2)(zd) of the Electricity Act 2003, after draft publication in the State Rajpatra on 19 August 2017 and two public hearings (p1).

Chapter I (pp1–8) is preliminary: commencement, a long definitions list (act, auxiliary consumption, capital cost, control period, HIMURJA, installed capacity, interconnection point and facilities, net saleable energy, project, project line, small hydro project, REC mechanism, renewable energy sources, useful life and others), the scope of application with carve-outs for already-signed or already-approved PPAs, projects up to 100 kW and competitively bid tariffs, and technology-by-technology eligibility criteria (wind, SHP, biomass Rankine, non-fossil cogeneration, solar PV/thermal, gasifier, biogas, MSW and RDF) (pp2–8).

Chapter II (pp8–11) covers promotion of RE generation: PPA or open-access routes, connectivity application lead times, interconnection agreements, licensee obligations to build interconnection facilities and to repay generator-funded build-and-transfer works, the grid-connectivity cost mechanism, and a possible coordination committee (pp8–11).

Chapter III (pp11–26) is the tariff heart: PPA structure, the control and tariff periods, the special grandfathering regime for small hydro projects, tariff design (levellised, fixed and fuel cost components), the menu of tariff options, generic levellised tariff, project specific levellised tariff and the exit options where it strays outside a band around the generic rate, tariff for the residual period after REC sales, treatment of capacity enhancement, the framework by which other RE technologies are dealt with by separate Commission orders, the petition procedure for project specific tariff, and the limited grounds for tariff review (pp11–26).

Chapter IV (pp26 onwards) sets financial principles: capital cost norms and exclusions, treatment of subsidy/incentive/GBI, debt-equity ratio, loan tenure and interest rate, and depreciation. Regulations up to 42 are referenced (p14, p17, p24, p26).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Power procurement and PPAs

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.