Special Order dated 02.11.2026 on Validity of Temporary Supply

Special Order dated 02.11.2026 on validity of Temporary Supply

OrderDated 2 Nov 2026OERC/Engg.-92/2003(Vol.VIII)/ 1746 dated 02.11.2026

Made under the Odisha Distribution (Conditions of Supply) Code, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page special order of the Odisha Electricity Regulatory Commission responding to a request from the State's Energy Department to align the duration of temporary electricity connections for construction with the Business Reforms Action Plan (BRAP) push for ease of doing business (p1). The Energy Department's letter of 12.10.2026 asked the Commission to direct the State's distribution companies to let temporary construction connections run until projects are completed, rather than stopping at the capped validity fixed by the Supply Code (p1).

The Commission notes that Clause 138(p) of the OERC Distribution (Conditions of Supply) Code, 2019 caps such validity at six months, and that the process of finalising a new Supply Code is still under way and will take time to notify (p1). Using Clause 208 read with Clause 201 of that Code, it therefore directs that the Clause 138(p) cap shall not apply to construction activity for commercial complexes, residential houses and industrial premises, and that temporary supply for these eligible projects shall instead be co-terminus with completion of the construction activity (p1).

The order attaches conditions: DISCOMs must take a due declaration of the project completion timeline from the project developer before energising, may use a smart pre-payment meter where feasible, and must continue to apply all existing commercial conditions, billing mechanisms, security deposits and technical safety standards for temporary connections (p1). The directions stay in force only until the new Supply Code is notified (p1). It is a transitional, stop-gap instrument — not an amendment to the Code itself — and it applies only to the three named categories of construction, leaving other temporary-supply users under the existing cap.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply, Metering

Read with this

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document