OERC · Odisha Electricity Regulatory Commission

New connection timelines and service connection charges notification, 2024

Notification dated 09.12.2024

NotificationDated 9 Dec 2024OERC-Engg-92/2003 (Vol.VIII) / 1424 / Dt. 09.12.2024 dated 9 th December 2024

Read with the Odisha Distribution (Conditions of Supply) Code, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Odisha Electricity Regulatory Commission has issued a short notification (No. OERC-Engg-92/2003 (Vol.VIII)/1424, dated 9 December 2024) to give effect to the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 and its 2024 amendment while the Commission's own Distribution (Conditions of Supply) Code, 2019 is still under amendment — a process the Commission says needs more time (p1).

The notification relies on Regulation 201 of the Code and the citizen-friendly reform decision of the 3rd National Conference of Chief Secretaries (27–29 December 2023) (p1). It directs two things.

First, on timelines: the deadline for releasing a new connection is to follow Rule 4(11) of the Electricity (Rights of Consumers) Amendment Rules, 2024 instead of Regulation 33(a) and 33(b) of the Code. The notification reprints Regulation 33 in substituted form, with one timeline for municipal areas and another for rural areas where no network work is needed, a longer period where extension of mains or a new substation is required, and a proviso allowing the licensee to seek extra time from the Commission in large-extension cases (p1–2).

Second, on money: new service connection charges are fixed by contract-demand slab (5 kW up to 150 kW), payable at application, excluding GST, processing fee, meter cost and security deposit, overriding Regulation 22(vi) while being read with Regulation 134 (p2). A note states the amounts assume an average 30-metre service length using armoured cable (p2).

The directions take effect from the date the Commission notifies them and stay in force until the Code is amended (p2).

Standard name
Electricity Supply Code, Electricity (Rights of Consumers) Rules
Primary topics
New connections and load changes, Connection and miscellaneous charges, Conditions of supply

Read with this

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document