OERC · Odisha Electricity Regulatory Commission
Distribution (Conditions of Supply) Code, 2019 — 3rd Amendment Code, 2024
Odisha Electricity Regulatory Commission Distribution (Conditions of Supply) (3rd Amendment) Code, 2024
AmendmentDated 22 Nov 2024Published in the Gazette 10 Dec 2024No. 1345—OERC-Engg-92/2003 (Vol.VIII)-Dt. 22-11-2024 dated 22-11-2024
Amends the Odisha Distribution (Conditions of Supply) Code, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A two-page gazette notification by the Odisha Electricity Regulatory Commission that substitutes Regulation 27 of the OERC Distribution (Conditions of Supply) Code, 2019. It is the Code's third amendment and is cited as the OERC Distribution (Conditions of Supply) (3rd Amendment) Code, 2024 (p1).
The substituted Regulation 27 places the cost of extending or upgrading a distributing main up to a consumer's point of supply — and of strengthening, augmentation or upgradation of the system from the feeding substation — on the consumer or a collective body of such consumers, in line with the norms in Appendix I of the parent Code (p1–2).
A proviso overrides Appendix I for Central Government projects where an infrastructure developer shifts electrical installations of the distribution network under the utility's supervision: supervision charges are levied at 2.5% of the total approved estimated cost of the capital work in that case, and at 6% where the utility takes up the work on deposit basis (p2).
The amendment comes into force on gazette publication, 10 December 2024 (p1). The Commission records that it framed the parent Code under the Electricity Act 2003 and obtained objections and suggestions on the draft under s.181(3) before notifying (p1). Appendix I itself is not reproduced, so the underlying cost-sharing norms must be read from the parent Code.
Read with this
The regulation
- Dated 27 Aug 2019Odisha Distribution (Conditions of Supply) Code, 2019
Amendments and corrections
- Dated 10 Nov 2023Distribution (Conditions of Supply) Code, 2019 — 1st Amendment, 2023
- Dated 22 Jan 2024Distribution (Conditions of Supply) Code, 2019 — 2nd Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Nov 2026Special Order dated 02.11.2026 on Validity of Temporary Supply
Proposed changes (drafts with no final yet)
- Dated 29 Jul 2025Odisha Distribution (Conditions of Supply) Code, 2025 — Draft
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.