Distribution (Conditions of Supply) Code, 2019 — 3rd Amendment Code, 2024

Odisha Electricity Regulatory Commission Distribution (Conditions of Supply) (3rd Amendment) Code, 2024

AmendmentDated 22 Nov 2024Published in the Gazette 10 Dec 2024No. 1345—OERC-Engg-92/2003 (Vol.VIII)-Dt. 22-11-2024 dated 22-11-2024

Amends the Odisha Distribution (Conditions of Supply) Code, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page gazette notification by the Odisha Electricity Regulatory Commission that substitutes Regulation 27 of the OERC Distribution (Conditions of Supply) Code, 2019. It is the Code's third amendment and is cited as the OERC Distribution (Conditions of Supply) (3rd Amendment) Code, 2024 (p1).

The substituted Regulation 27 places the cost of extending or upgrading a distributing main up to a consumer's point of supply — and of strengthening, augmentation or upgradation of the system from the feeding substation — on the consumer or a collective body of such consumers, in line with the norms in Appendix I of the parent Code (p1–2).

A proviso overrides Appendix I for Central Government projects where an infrastructure developer shifts electrical installations of the distribution network under the utility's supervision: supervision charges are levied at 2.5% of the total approved estimated cost of the capital work in that case, and at 6% where the utility takes up the work on deposit basis (p2).

The amendment comes into force on gazette publication, 10 December 2024 (p1). The Commission records that it framed the parent Code under the Electricity Act 2003 and obtained objections and suggestions on the draft under s.181(3) before notifying (p1). Appendix I itself is not reproduced, so the underlying cost-sharing norms must be read from the parent Code.

Standard name
Electricity Supply Code
Primary topics
Connection and miscellaneous charges

Read with this

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.