OERC · Odisha Electricity Regulatory Commission
Odisha Distribution (Conditions of Supply) Code, 2019
Odisha Electricity Regulatory Commission Distribution (Conditions of Supply) Code, 2019
CodeDated 27 Aug 2019No.OERC/Engg/92/2003(Vol-VII)/1210 dated The 27th August, 2019
3 amendments to it are on Voltaic, the latest dated 22 Nov 2024.
Summary
Summary written by software, from pages 1 to 25 of 95. Check the regulator's original before you rely on it.
The Odisha Electricity Regulatory Commission issued this Code by notification dated 27 August 2019 to govern retail distribution and supply in Odisha (p1). It is made under s.50 and s.181(2)(t), (v), (w) and (x) read with Part-VI of the Electricity Act, 2003, and is intended to cover supply by licensees/suppliers to consumers and end users, recovery of electricity charges, billing intervals, disconnection and restoration, tampering and damage to electrical plant/line/meter, and entry for meter/line works (p1). It extends to the whole State and applies to all distribution and retail supply licensees including deemed licensees, all consumers and end users, other persons doing distribution/supply, persons exempted under s.13, and unauthorized supply/use (p1–2). It supersedes the 2004 Supply Code and amendments; the Commission may amend annexed forms/formats by special order (p2). It comes into force on Gazette publication, though the Gazette date is not printed (p1).
Chapter I gives title, commencement, extent and applicability (p1–2). Chapter II defines key terms used across the Code, including consumer voltage categories, contract demand, maximum demand, meters (bi-directional, net, prepaid, smart/AMI), prosumer, obliged entity, load factor and security-deposit concepts (p3–10).
Chapter III deals with power supply. It specifies application forms and documents for new/additional/temporary connections, fees by phase and voltage, online filing, proof of identity/ownership/address, category-specific NOCs and undertakings, and treatment of arrears and new owners (p11–15). It sets processing steps—acknowledgment, application register, first-come-first-served, waiting list, site inspection—and estimate/security-deposit requirements, including standardised LT connection charges (p15–17). It allocates network strengthening and extension costs, defines remuneration principles, and sets supply timelines for LT, 11 kV and 33 kV and a Commission route for new 33/11 kV substations (p17–19). It then covers shifting of service/lines, transfer/change of name, change of category, conversion of service, meter shifting, default penalties and compensation, the agreement, termination and disconnection records (p20–24). The part ends in the security-deposit provisions: initial deposit formula, load factors by consumer category, prepaid-meter exemption, annual review and shortfall/refund threshold (p24–25).
Read with this
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Nov 2026Special Order dated 02.11.2026 on Validity of Temporary Supply
Proposed changes (drafts with no final yet)
- Dated 29 Jul 2025Odisha Distribution (Conditions of Supply) Code, 2025 — Draft
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.