This is a two-page OERC notification that substitutes Regulation 57 of the OERC Distribution (Conditions of Supply) Code, 2019 — the provision governing interest payable to consumers on security deposits held by the licensee/supplier (p1–2). The Commission states the trigger plainly: an incongruity in the definition of "Bank Rate" between the 2019 Code and the OERC (Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff) Regulations, 2022, which it says produced an anomaly in the meaning and implications of Regulation 57(i) and 57(ii) (p1). Draft amendments were published for objections and suggestions under s.181(3) of the Electricity Act 2003 before notification (p1).
The replacement regulation anchors the interest rate to the RBI bank rate as on 1 April of the relevant year, with a proviso letting the Commission direct a higher rate in its tariff order for the financial year (p1). It then sets the adjustment cycle — interest credited to the consumer is adjusted annually against amounts outstanding as on 1 May and amounts falling due immediately thereafter — requires the licensee to show interest becoming due in consumer bills, and imposes interest at twice the specified rate where the adjustment is delayed (p2).
The amendment takes effect on publication in the Official Gazette (p1). The notification is dated 22 January 2024 but the Gazette carrying it is dated 2 March 2024, so the operative date is the later one (p1).
Read with this
The regulation
- Dated 27 Aug 2019Odisha Distribution (Conditions of Supply) Code, 2019
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Nov 2026Special Order dated 02.11.2026 on Validity of Temporary Supply
Proposed changes (drafts with no final yet)
- Dated 29 Jul 2025Odisha Distribution (Conditions of Supply) Code, 2025 — Draft
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.