Summary
Summary written by software. Check the regulator's original before you rely on it.
A short, two-clause amendment to the OERC Distribution (Conditions of Supply) Code, 2019. The preamble (p1) explains the trigger: the Code's Irrigation Pumping and Agriculture category was open only to pumping capacity below 15 HP, which pushed groups of small and marginal farmers sharing one connection, and state protective irrigation projects running 30 HP pumps, into the costlier General Purpose tariff. The Directorate of Agriculture and Food Production raised the point.
Clause 1 (p1) gives the short title and says the amendment takes effect on publication in the Official Gazette; the Commission records that it obtained objections and suggestions on the draft under s.181(3) of the Electricity Act, 2003.
Clause 2 (p2) substitutes Regulation 138(e) wholesale. The new text restates the scope of the irrigation category — water pumping for lift and flow irrigation and from wells, borewells, nallahs, streams and rivers exclusively for agriculture — keeps the exclusion of Municipality/NAC areas with population above 25,000 (2011 Census), and raises the eligibility ceiling to aggregate pumping capacity of up to 30 HP at a single point of supply.
The notification is dated 10 November 2023 but the Gazette copy is dated 30 April 2024 (p1).
Read with this
The regulation
- Dated 27 Aug 2019Odisha Distribution (Conditions of Supply) Code, 2019
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Nov 2026Special Order dated 02.11.2026 on Validity of Temporary Supply
Proposed changes (drafts with no final yet)
- Dated 29 Jul 2025Odisha Distribution (Conditions of Supply) Code, 2025 — Draft
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.