WBERC · West Bengal Electricity Regulatory Commission
West Bengal Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Draft
West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) (Fourth Amendment) Regulations, 2023
Draft amendmentDated 24 Jan 2023WBERC/Regulation-73/22-23/3380 dated 24th January, 2023
Draft
A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2011 — Fourth Amendment, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
WBERC's public notice of 24 January 2023 (p1) announces that the Commission proposes a Fourth Amendment to its 2011 Tariff Regulations and invites objections, suggestions and comments from stakeholders by 17 February 2023, 3 p.m., at its New Town, Kolkata office, with the draft available on the Commission's website. The draft regulation itself follows (pp2–56).
The draft is made under sections 181(1) and (2) read with section 61 of the Electricity Act, 2003, and amends the WBERC (Terms and Conditions of Tariff) Regulations, 2011 (Notification 48/WBERC dated 25.04.2011) as already amended by the First, Second and Third Amendments of 2012, 2013 and 2020, together called the Principal Regulations (p2). It would commence on and from 01.04.2023, but ARR, APR, FCA and FPPCA applications for periods before that date remain governed by the pre-amendment regulations (p2).
The early clauses redefine Plant Load Factor with a formula and introduce 'Useful Life' by reference to a new annexure (pp2–3); rewrite the controllable/uncontrollable factor regime, the pass-through of uncontrollable gains and losses (monthly fuel and variable cost adjustment for generators and licensees) and the one-third sharing of controllable gains and losses (pp3–4); tie APR computations and carrying cost on revenue gaps and surpluses to that framework (p5); and re-cast regulation 2.8.6 so that operating norms for 2023-24 to 2025-26 come from Schedule-9A, with later years to be notified separately, gains and losses shared per regulation 2.5.5 and performance incentives governed by Schedule-10 (pp5–7).
A second block deals with capital and financing: investment approval is dispensed with for grant-funded projects, consumer-contribution and grant assets are excluded from loan, equity and depreciation, replacement, de-capitalisation and the net value of replaced assets are dealt with, debt and equity feed the interest and return computations, and regulated rates of return, depreciation mechanics and financing costs are revised (pp7–17). Working-capital components and the interest rate on working capital are set out separately for coal and hydro/pumped-storage generation, transmission and distribution (pp14–17).
O&M is re-specified: composition, station-wise norms, water charges, the definition of a Bay for transmission, R&M as a percentage of gross fixed assets, A&G expenses escalated by a hybrid WPI/CPI index, and OPEX proposals (pp17–21). Coal from integrated mines gets an input-price methodology following CERC principles, with an interim notified-price rule (pp21–22).
On operations, capacity charge recovery is tied to SLDC-certified availability, deviation is settled through DSM charges under the WBERC DSM Regulations, 2021, and a detailed seasonal, peak/off-peak capacity charge formula is substituted (pp23–29), with late payment surcharge re-specified (p29).
Schedules and annexures do much of the work: a wholly substituted Schedule-9A of operating norms for coal, hydro and pumped-storage stations and for transmission and distribution licensees (pp30–36); deletion of Schedule-9B; a rewritten Schedule-10 incentive paragraph with the remaining paragraphs deleted (pp36–37); new depreciation-rate and useful-life annexures (pp37–41); consumer-category changes including a Life Line Domestic Consumer definition and a new MES category (p41); and substituted tariff forms and Summarised Revenue Requirement formats (pp42–55).
Read with this
The regulation
- Dated 25 Apr 2011West Bengal (Terms and Conditions of Tariff) Regulations, 2011
Amendments and corrections
- Dated 27 Aug 2012Terms and Conditions of Tariff Regulations, 2011 — Amendment Regulations, 2012
- Dated 30 Jul 2013Terms and Conditions of Tariff Regulations, 2011 — 2013 Amendment
- Dated 11 Sep 2013Terms and Conditions of Tariff (Amendment) Regulations, 2013 — Corrigendum
- Dated 21 Jan 2020Terms and Conditions of Tariff Regulations, 2011 — Third Amendment, 2020
- Dated 13 Mar 2023Terms and Conditions of Tariff Regulations, 2011 — Fourth Amendment, 2023
- Dated 26 Nov 2021Changes some provisions: West Bengal Deviation Settlement Mechanism and Related Matters Regulations, 2021
Commencement notices and reasons
Earlier drafts
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.