Skip to content

WBERC · West Bengal Electricity Regulatory Commission

West Bengal (Terms and Conditions of Tariff) Regulations, 2011

West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2011

RegulationDated 25 Apr 2011Published in the Gazette 29 Apr 2011No. 48/WBERC dated the 25th April, 2011

Replaced by Terms and Conditions of Tariff Regulations, 2026

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software, from pages 1 to 22 of 321. Check the regulator's original before you rely on it.

This is WBERC’s principal tariff regulation for West Bengal, issued on 25 April 2011 as Notification No. 48/WBERC and published in the Kolkata Gazette on 29 April 2011 (p1). It is made under the Electricity Act, 2003 and the Electricity (Removal of Difficulties) Third and Eighth Orders, 2005, and supersedes Notification No. 31/WBERC dated 9 February 2007 (p1). It extends to the whole of West Bengal and comes into force on gazette publication. It governs tariff determination by the Commission under section 62, the purchase and procurement process of distribution licensees, and the timing of annual performance review (APR), fuel and power purchase cost adjustment (FPPCA) and monthly fuel/variable cost adjustments (pp1–2).

Chapter 1 (pp1–12) sets commencement and applicability. The regulation does not determine generation tariff for certain direct commercial, open-access and captive cases, but does apply there for wheeling/transmission charges and applicable cross-subsidy surcharge (p2). It defines a large set of technical, accounting and commercial terms used throughout, including control period, ARR, ERC, availability, declared capacity and MYT concepts.

Chapter 2 (pp13–22, continuing) sets the tariff-determination framework. It lists the cases in which the Commission will determine tariff and when it will only adopt or accept tariffs determined through bidding, CERC or power exchanges (pp13–15). It states guiding factors, including cost of supply, cross-subsidy limits, efficiency, consumer interest and renewable promotion (pp16–17). It prescribes State Government subsidy provision and the hearing/objection process (p19). It establishes the multi-year tariff framework for the third control period (2011-12 to 2013-14), the contents of the MYT filing and the information required for ARR and tariff applications (pp19–22). Schedules referred to later include operating norms, the FPPCA formula, financial principles and forms, but they are not in the supplied pages.

Standard name
Multi Year Tariff Regulations
Primary topics
Tariff determination, Multi Year Tariff (MYT), ARR and true-up

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document