WBERC · West Bengal Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2011 — Amendment Regulations, 2012
West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) (Amendment) Regulations, 2012
AmendmentDated 27 Aug 2012Published in the Gazette 27 Aug 2012No. 49/WBERC dated 27th August, 2012
Replaced by Terms and Conditions of Tariff Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
Amends the West Bengal (Terms and Conditions of Tariff) Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a single omnibus amendment to the WBERC (Terms and Conditions of Tariff) Regulations, 2011 — the "Principal Regulations" — issued as Notification No. 49/WBERC and published in the Kolkata Gazette Extraordinary on 27 August 2012, coming into force on that publication date (p1). It carries 37 numbered clauses that rewrite or insert tariff-regulation provisions across the whole instrument: scope, definitions, ARR and capital expenditure, working capital and coal pricing, income from UI, short-term power procurement, metering/miscellaneous charges, and the depreciation and prepaid-meter annexures (p1–16).
Clauses 2–3 reset applicability and definitions. Regulation 1.1(v) is replaced so the tariff regulations no longer apply to captive use, open-access supplies, trader-to-consumer supplies, cross-area distribution licensee supply, exchange-based drawal and exempted persons — but still apply to those cases for wheeling/transmission charges and cross-subsidy surcharge computation; a new clause (vi) carves out the cogeneration and renewable regulations (p1–2). New definitions are inserted for EHT/EHV, HT/HV, LT/LV, MT/MV, "Specified Institutions" and "State Grid Code" (p2), and clause 34 of the amendment defines which institutions qualify for that status (p15–16).
Clauses 4–10 concern the ARR and capital expenditure regime: consequential ARR changes on addition/deletion of supply sources and power to withhold/deduct ARR for non-compliance (p3); levellised tariff methodology tied to CERC parameters and s.63 bidding (p3); mandatory Commission approval for new transmission investment and for distribution projects above a cost threshold (Rs 125 crore or 5% of gross fixed assets, whichever is lower) (p3); approval before bearing fixed costs on others' transmission assets (p3); a self-approval window for small capital schemes under a higher threshold (Rs 200 crore or 5%) (p3–4); carry-forward of operating norms beyond 2013-14 (p4); and a new regulation 2.8.9.5 extending calculation principles across tariff determination and APR/FPPCA truing-up, with reliance on external data and a 7-working-day objection window (p4–5).
Clauses 11–17 deal with power purchase price caps, the effect of an order's effective date inside a billing cycle (new regulation 3.15 on pro-rata energy, demand, rebate and MVCA/MFCA application) (p5), demand-charge applicability to HV/EHV and to LV/MV consumers at or above 50 KVA contract load (p5), annual recalculation of contract demand and the consequences for category and load enhancement (p6), and capital cost treatment of trial-run cost, infirm-power revenue and deemed equity of inoperative units (p6).
Clauses 18–23 govern working capital interest (normative base, reduced rate where monthly cost adjustment exists, banking carrying cost at SBI prime lending rate), coal price admissibility where indigenous coal is not graded on CIL norms, a GCV-to-UHV conversion table (p9), supplementary power-purchase bills feeding MVCA/MFCA, and a rewritten regulation 5.17 on sharing of UI income between consumers and the distribution licensee (p7–9).
Clauses 24–27 liberalise short-term procurement: exemptions from prior approval where a ceiling fixed by the Commission is respected and bidding conditions met (75% of power used to meet shortage, at least three bidders, ceiling capped at 125% of pooled long-term purchase cost); emergency procurement without approval or bidding on listed grounds (shortage over 10%, disaster, SLDC direction, State Government order); new regulations 7.5.6–7.5.10 on procurement under existing PPAs, GoI/CEA allocations, within-year cost limits, treatment of spinning reserve as demand, and s.63 bidding (p10–11). Clause 27 adds e-payment gateway service charges (p11).
Clauses 28–37 amend the schedules and annexures: power procurement planning assumptions on availability, spinning and cold reserve (p11–12); a fully rewritten MVCA formula and notes in Schedule-7B, plus MFCA instalment and effective-date provisions (p12–15); revised depreciation rows for meters and computer systems and useful-life notes (p15); and reworked notes on specified-institution status, prepaid metering availability and optional tariffs (p15–16).
Read with this
The regulation
- Dated 25 Apr 2011West Bengal (Terms and Conditions of Tariff) Regulations, 2011
Amendments and corrections
- Dated 30 Jul 2013Terms and Conditions of Tariff Regulations, 2011 — 2013 Amendment
- Dated 11 Sep 2013Terms and Conditions of Tariff (Amendment) Regulations, 2013 — Corrigendum
- Dated 21 Jan 2020Terms and Conditions of Tariff Regulations, 2011 — Third Amendment, 2020
- Dated 13 Mar 2023Terms and Conditions of Tariff Regulations, 2011 — Fourth Amendment, 2023
- Dated 26 Nov 2021Changes some provisions: West Bengal Deviation Settlement Mechanism and Related Matters Regulations, 2021
Commencement notices and reasons
Earlier drafts
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.