WBERC · West Bengal Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2011 — Third Amendment, 2019 — Draft
West Bengal Electricity Regulatory Commission (Terms and Conditions ofTariff) (Third Amendment) Regulations, 2019
Draft amendmentDated 14 Aug 2019WBERC/Regulation-56/19-20/4516 dated 14 1 hAugust, 2019
Draft
A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2011 — Third Amendment, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a consultation package issued by the West Bengal Electricity Regulatory Commission: a one-page notice (p1) inviting objections, suggestions and comments on the draft WBERC (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2019, with receipt closed on 12.09.2019 by 5 p.m., followed by the draft amendment regulations themselves in notification form (pp2–11).
The draft amends the WBERC (Terms and Conditions of Tariff) Regulations, 2011, as already amended by the First and Second Amendments. It would insert a definition of 'GCV as received' measured through third-party sampling at the unloading point of a thermal station (pp2–3); replace the delayed payment surcharge regime in reg 4.14 with graded rates for consumers generally and a separate table for L&MV agriculture consumers (p3); and substitute regs 5.8.1–5.8.7 on how energy charges for thermal generating stations are built up from landed fuel cost — primary fuel, secondary fuel oil, emission-control reagents, transit and handling losses, GCV treatment, integrated-mine and auction-mine fuel pricing, fuel mix, escalation and use of alternative fuels (pp4–7).
Later clauses delete reg 5.8.15, replace 'UHV' with 'GCV' in two clauses and in Schedule-7A/7B parameters, and substitute reg 8.5.4 to create an additional e-payment rebate capped per bill, with exclusions and a worked illustration (pp7–9). The CVPF parameter and a new biomass-blending paragraph are added to Schedule-1 (pp8–9). Annexure-C1 gains three categories under HV & EHV consumers — metro rail/airport, military engineering and EV charging stations (pp9–10) — and Annexure-1 replaces Forms D1–D3 with a single Form D for source-wise fuel details (pp10–11).
The amendments take effect on Gazette publication but apply from 01.10.2019, with ARR, APR, FCA and FPPCA for earlier periods governed by the pre-amendment regulations (p2).
Read with this
The regulation
- Dated 25 Apr 2011West Bengal (Terms and Conditions of Tariff) Regulations, 2011
Amendments and corrections
- Dated 27 Aug 2012Terms and Conditions of Tariff Regulations, 2011 — Amendment Regulations, 2012
- Dated 30 Jul 2013Terms and Conditions of Tariff Regulations, 2011 — 2013 Amendment
- Dated 11 Sep 2013Terms and Conditions of Tariff (Amendment) Regulations, 2013 — Corrigendum
- Dated 21 Jan 2020Terms and Conditions of Tariff Regulations, 2011 — Third Amendment, 2020
- Dated 13 Mar 2023Terms and Conditions of Tariff Regulations, 2011 — Fourth Amendment, 2023
- Dated 26 Nov 2021Changes some provisions: West Bengal Deviation Settlement Mechanism and Related Matters Regulations, 2021
Commencement notices and reasons
Earlier drafts
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.