Terms and Conditions of Tariff Regulations, 2011 — Fourth Amendment, 2023

West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) (Fourth Amendment) Regulations, 2023

AmendmentDated 13 Mar 2023Published in the Gazette 13 Mar 2023In force from 1 Apr 2023No. 76/WBERC dated 13.03.2023

Replaced by Terms and Conditions of Tariff Regulations, 2026

See that regulation for the date it took effect and for anything it keeps in force.

Amends the West Bengal (Terms and Conditions of Tariff) Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software, from pages 1 to 22 of 47. Check the regulator's original before you rely on it.

This is the West Bengal Electricity Regulatory Commission's Fourth Amendment to its 2011 Terms and Conditions of Tariff Regulations, issued as Notification No. 76/WBERC in the Kolkata Gazette of 13 March 2023 and brought into force from 1 April 2023 (p1). It amends the 2011 Principal Regulations as already amended in 2012, 2013 and 2020 (p1). Applications for ARR, APR, FCA and FPPCA for periods before 1 April 2023 remain governed by the pre-amendment text (p1).

Clauses 2–9 insert or replace definitions and the controllable/uncontrollable factor regime: change in law and force majeure are aligned to CERC Tariff Regulations; plant load factor is given a formula; useful life is moved to Annexure A-II; gains or losses from uncontrollable factors are passed through, with fuel and power-purchase adjustments handled monthly, while controllable-factor gains or losses are shared with beneficiaries (p1–3). Clauses 7–9 adjust APR treatment and allow carrying cost on revenue gaps or surpluses (p3).

Clauses 10–29 deal with capital cost, return and depreciation: they delete specified legacy regulations, restrict interest-during-construction capitalization after scheduled COD, revise operating-norm and incentive framework, exempt grant-funded projects from investment approval, change contract-demand computation, address consumer/grant-funded assets, de-capitalisation, debt-equity, return on equity for assets before and after 1 April 2024, depreciation mechanics, and interest on working capital for generation, transmission and distribution (p3–11).

Clauses 30–46 revise O&M expenses for generating stations, transmission and distribution; treat integrated-mine coal input price using CERC principles; delete further provisions; replace UI with deviation settlement under the 2021 DSM Regulations; set monthly capacity-charge formulae for thermal stations across high- and low-demand seasons; and set late-payment surcharge (p11–18).

Clauses 47–51 adjust schedules for fuel cost and depreciation. Clause 52 substitutes Schedule 9A, the operating norms for coal thermal, hydro and pumped storage, and transmission licensees, covering heat rate, PLF, PAF, auxiliary consumption, secondary fuel oil, manpower, transit loss, O&M costs, stabilization, hydro pumping energy, availability and transmission loss (p19–22).

Standard name
Tariff Regulations
Primary topics
Tariff determination, ARR and true-up, Fuel and power purchase cost adjustment

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document