Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2011 — 2013 Amendment

West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) (Amendment) Regulations, 2013

AmendmentDated 30 Jul 2013Published in the Gazette 30 Jul 2013No. 54/WBERC dated the 30th July, 2013

Replaced by Terms and Conditions of Tariff Regulations, 2026

See that regulation for the date it took effect and for anything it keeps in force.

Amends the West Bengal (Terms and Conditions of Tariff) Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software, from pages 1 to 24 of 29. Check the regulator's original before you rely on it.

The West Bengal Electricity Regulatory Commission issued this amendment to its 2011 Terms and Conditions of Tariff Regulations, as already amended in 2012, through Gazette notification No. 54/WBERC dated 30 July 2013 (p1). It comes into force on publication in the Official Gazette — the Gazette date printed is 30 July 2013 — and is made under sections 181(1) and (2) read with section 61 of the Electricity Act, 2003 (p1).

Clauses 2–7 amend the definition clause, Regulation 1.2.1, inserting or substituting definitions for banking/swapping, irrigation supply, short-term irrigation supply, SLDC, specified institutions, start-up power and survival power (p1–2). Clauses 8–13 reset the controllability table for ARR items in Regulation 2.5.5, tighten the annual performance review and additional-expenditure tests, set the small-scheme capital expenditure regime (including emergency intimation and deemed no-objection), and restate the operating-norm basis for 2014-15 and onwards (p2–6).

Clauses 14–21 deal with tariff design: load-factor rebate, regulatory-asset amortisation, fixed and demand charges for LV/MV consumers, merger of consumer classes, start-up/survival power demand charges, new rebates for peak-period demand, and delayed payment surcharge (p7–8). Clauses 22–28 revise financial norms and open-access/UI treatment: capital cost savings on early commissioning, debt-equity and normative loan interest, O&M composition, banking/swapping cost at pooled power purchase cost, sharing of net UI receivables, and UI charges for open-access customers who are also consumers (p8–10).

Clause 29 substitutes Paragraph A of Schedule 7B, giving the monthly variable cost adjustment (MVCA) formula and its monthly computation, rounding, recovery and reporting rules (p10–14). Clause 30 substitutes the whole of Schedule 9A, which lays down operating norms for coal-fired thermal stations, hydro stations, transmission licensees and distribution licensees from 2014-15 onwards, including stabilisation periods and the treatment of new stations (p14–20). Clause 31 substitutes gain-sharing for distribution loss performance in Schedule 9B (p20–21). Clause 32 inserts a reliability incentive in Schedule 10, with licensee-specific target reliability norms (p21). Clause 33 substitutes Annexure C-1, listing consumer classes by licensee and setting the conditions for specified-institution status (p21–24).

Standard name
Tariff Regulations
Primary topics
Tariff determination, ARR and true-up, Generation tariff

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document