Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
6 documents match “energy storage obligation”.
Draft Procedure for Verification of Captive Status of Generating Plants in Telangana
Draft- Illustration… of electricity by the captive user may be either directly or through Energy Storage System: Provided further that the consumption by a subsidiary company as defined in clause (87) of section 2 of the Companies Act, 2013 (18 of 2013) or …
- 9. Verification of the consumption criteria of CGP as …… Technical losses in electrical network and energy storage system shall be included in the energy consumption of the captive users. The losses figures shall be as derived from the published data wherever its done at regular intervals and …
3 matching passages in this document
Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy/Renewable Energy Certificates) Regulation, 2022 — Draft
Draft· finalised as Renewable Power Purchase Obligation Regulation, 2022- 2. Definitions and interpretation"Renewable Energy with Storage Project" means a combination of renewable energy project with storage or a combination of renewable hybrid energy project with storage having a single point of injection or maximum two points of injection …
- (2) Roof-top Solar PV System… the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Generation) Regulations, 2010, as amended from time to time, shall also be treated as fulfilment of the RPPO prescribed herein. …
3 matching passages in this document
Framework for Resource Adequacy Regulations, 2025 — Draft
Draft· finalised as Framework for Resource Adequacy Regulation, 2026- 8. Aggregation of Demand Forecast › 9. Preparation of Generation Resource Planning… j) Renewable Purchase Obligation (RPO) including Energy Storage Obligation targets, etc.; k) Constraints such as penalties for unmet demand, forced outages, and system emission limits as defined in State Grid Code and Indian Electricity …
- 26.Power to Relax › ❖ Conventional Generation constraintsFulfilment of Renewable Purchase Obligation shall be considered as one of the objectives of Resource Adequacy. Technology options like renewable energy generation for round the clock energy supply backed with storage (Battery and PSP), …
3 matching passages in this document
Multi Year Tariff Regulation, 2023 — Draft
Draft· finalised as Multi Year Tariff Regulation, 2023- 44.7 Auxiliary Energy Consumption for all coal-based …… beneficiaries shall be entitled to equivalent energy of 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir from the generating station during peak hours and the generating …
- 48 Pumped Storage Hydro Generating Stations… 48.3 The Capacity Charge payable to a pumped storage hydel generating Station for a calendar month shall be: (AFC x NDM / NDY) (in Rupees), if actual Generation during the month is greater than or equal to 75 % of the Pumping Energy …
3 matching passages in this document
Draft Multi Year Tariff Regulation, 2023 — Explanatory Note
Draft· finalised as Multi Year Tariff Regulation, 2023- 4.3.4 Computation and Payment of Annual Fixed Charges and … › Energy Charges… changed to "as received" minus 85 kcal/kg on account of variation during storage at generating station. There is no existing gas based thermal generating stations in the State nor any new generating stations is envisaged in the …
- 4.3.1 Components of Tariff… Annual Fixed Charges and Energy Charge. The energy charge component is intended to recover the fuel costs for the primary fuel and secondary fuel consumption at normative parameters, in case of thermal generating stations. …
3 matching passages in this document
Smart Grid Regulation, 2020 — Draft
Draft· finalised as Smart Grid Regulation, 2021- DRAFT REGULATION › 2. Definitions… Energy Storage etc. within a control area; (d) “Bureau” means Bureau of Indian Standards (BIS) established under section 3 of the Bureau of Indian Standards Act, 2016; (e) “Central Electricity Authority (CEA)” means the Authority …
- DRAFT REGULATION › 2. Definitions… distributed energy resources and storage within clearly defined electrical boundaries to act as a single controllable entity with respect to the main grid. A microgrid uses information, …
3 matching passages in this document