Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
Showing the best matches for “energy storage obligation”: 9 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
BESS Regulations, 2025 — Regulation 5
- ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION KURNOOL › 2. Definitions… laid down in the Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking) Regulation, 2024 (Regulation No 3 of 2024) as amended from time to time. …
- ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION KURNOOL › 4. Ownership and Business Models… Renewable Energy Developers; An independent energy storage service provider Aggregators; Any other third-party investors. 4.2 BESS may be deployed as: Co-located with renewable or conventional generators; Grid-connected standalone …
3 matching passages in this document
Renewable Power Purchase Obligation Regulations, 2022 — First Amendment, 2023 — Consolidated
- 2. Definitions and Interpretation: In these Regulations, …'Hybrid Energy Sources' means two or more Renewable Energy Sources used together or any single Renewable Energy Source coupled with any Storage Technology (Battery and/or Pumped Storage utilising renewable energy to store energy, etc.) …
- 2. Definitions and Interpretation: In these Regulations, …… Pumped Hydro Storage utilising Renewable Energy, Municipal Waste, Industrial Waste, Biomass, Bagasse, Wind, Solar, Hybrid Energy Sources, biofuel cogeneration, Geo- thermal, Tidal and such other sources as recognized or approved by MNRE; …
3 matching passages in this document
Green Energy Open Access, Charges and Banking Regulation, 2024
- Preamble › 2. Definitions… “Green Energy” means the electrical energy from renewable sources of energy; j. “Obligated Entity” means the entities mandated to fulfil Renewable Power Purchase Obligation, which includes distribution licensee, captive users, and open …
- Preamble › 13. CROSS SUBSIDY SURCHARGE AND ADDITIONAL SURCHARGE… certificate on a yearly basis to the consumers who purchased the green energy from them as per the APERC Renewable Power Purchase Obligation (Compliance by the purchase of Renewable Energy/Renewable Energy Certificates) Regulation, 2022 …
3 matching passages in this document
Green Energy Open Access, Charges and Banking Regulation, 2024 — Consolidated (First and Second Amendments)
- 1. Short title, commencement, and extent of application › 2. Definitions… "Green Energy" means the electrical energy from renewable sources of energy; j. "Obligated Entity" means the entities mandated to fulfil Renewable Power Purchase Obligation, which includes distribution licensee, captive users, and open …
- 12. Charges to be levied for Green Energy Open Access › 13. CROSS SUBSIDY SURCHARGE AND ADDITIONAL SURCHARGE… Provided further that, the lapsed unutilised surplus banked energy entitled for RECs, if not claimed by the renewable energy generating station, the DISCOMs shall account for such lapsed energy to meet their Renewable Purchase Obligation …
3 matching passages in this document
Framework for Resource Adequacy, 2026 — Regulation 04
- 9. Preparation of Generation Resource Planning › System Planning and Constraints… The RPO, including Energy Storage Obligation targets. Identified and listed constraints, such as penalties for unmet demand, forced outages, system emission limits defined by the State Grid Code and the Indian Electricity Grid Code, and …
- PART II EXTRAORDINARY › Introduction… envisages a substantial addition of renewable energy capacity, with a long-term target of up to 160 GW. The State has been facilitating the development of renewable energy projects and energy storage infrastructure, including Pumped …
3 matching passages in this document
Regulation 11 of 2025 — First Amendment
Amends the Regulation 6 of 2025
- Introduction › Key aspects of the policy are… and hybrid energy sources, along with pumped storage projects. The democratisation of energy generation is supported by initiatives such as the PM Surya Ghar Yojana and PM KUSUM, promoting energy self-sufficiency. …
- Introduction › 10. Clause 14.3 of the Principal Regulation shall be …… Provided further that, the lapsed unutilised surplus banked energy entitled for RECs, if not claimed by the renewable energy generating station, the DISCOMs shall account for such lapsed energy to meet their Renewable Purchase Obligation …
2 matching passages in this document
Regulation 4 of 2023
2 amendments on Voltaic
- Introduction › 5. Capacity of Rooftop Systems… 5.1 The capacity of a Grid-Interactive SRTPVS with/without Battery Energy Storage System under Net/Gross metering or net billing mechanism or net feed-in to be installed at the premises of any individual prosumer shall not be less than 1 …
- Introduction › 1. Short title, Applicability, and Commencement1.3 This Regulation shall be applicable to all the Grid-Interactive Solar Rooftop Photovoltaic systems with/ without Battery Energy Storage Systems (BESS), installed and commissioned in the areas of Distribution licensees, Andhra Pradesh …
3 matching passages in this document
Terms and Conditions for Tariff Determination (Generation Supply and Distribution Purchase), 2008
- NOTIFICATIONS BY HEADS OF DEPARTMENTS, Etc. › Note"Secondary Energy" in relation to a hydro power generating station means the quantum of energy generated in excess of the design energy on per year basis at the generating station; …
- NOTIFICATIONS BY HEADS OF DEPARTMENTS, Etc. › 13.2 Hydro power generating stations… Rate of primary energy for all hydro electric power generating stations, except for pumped storage generating stations, shall be equal to average of the lowest variable charges of the Central and State thermal power generating stations …
3 matching passages in this document
Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — Consolidated (First Amendment, 2025; Errata, 2026)
- 2. Definitions and interpretations › 5. Capacity of Rooftop Systems… 5.1 The capacity of the Grid-Interactive SRTPVS with/without Battery Energy Storage System under Net/Gross Metering or net billing mechanism or net feed-in to be installed at premises of any individual prosumer shall not be less than 1 …
- (Regulation 4 of 2023) › 2. Definitions and interpretations… 8 --> the demand response mechanism, Distributed Generation, Energy Storage, etc., within a license area. The aggregators shall assist the DISCOMs, inter alia, in the promotion of Distributed Generation/storage like Solar Rooftop …
2 matching passages in this document