Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Regulation 11 of 2025 — First Amendment

Regulation 11 of 2025 First Amendment

AmendmentDated 4 Dec 2025Published in the Gazette 8 Dec 2025

Amends the Regulation 6 of 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

On 4 December 2025 the Andhra Pradesh Electricity Regulatory Commission issued the first amendment to its Green Energy Open Access, Charges and Banking Regulation, 2024 (Regulation No. 3 of 2024); it was published in the AP Extraordinary Gazette on 8 December 2025 (p1, p11). The amendment rewrites the working core of that regulation and carries a worked illustration as its annexure.

The introduction (pp1–4) records the trigger: the Government of Andhra Pradesh's Integrated Clean Energy Policy, 2024, conveyed by the Special Chief Secretary/Energy under section 108 of the Electricity Act, 2003, with the policy's targets, technology list and investment ambitions. A draft amendment went out with a public notice on 26 March 2025; comments were received, a revised draft was circulated, and the final amendment follows an order of 4 December 2025.

The operative clauses (pp4–11) replace the definition of "banking" and let EV charging stations buy input power through a green energy open access generator; replace the connectivity and energy-settlement clause with block-wise settlement, banking of over-injection and under-drawal, inadvertent-energy treatment and deviation rules for RE generators; replace the treatment of existing and new entities, grandfathering open access agreements signed before the principal regulation; set metering rules including a smart-meter requirement for LT open access; replace standby charges and their duration; add cross-subsidy and additional-surcharge exemptions for green hydrogen, solar module/wind turbine and battery manufacturing; and replace the banking cycle, the 30% cap on banked energy, and the time-of-day rules for banking and drawal. The final clause protects agreements from later amendments.

The Annexure (pp12–16) is a numerical illustration of block-wise settlement, the banking cap, banking charges and time-of-day settlement, with a disclaimer that the regulation prevails over it.

Standard name
Green Energy Open Access Regulations

Read with this

The regulation

Commencement notices and reasons

Consolidated copies, for reference (1)

Other copies of these documents (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document