APERC · Andhra Pradesh Electricity Regulatory Commission
Regulation 6 of 2025
RegulationDated 11 Sep 2025Published in the Gazette 12 Sep 2025No.616 dated SEPTEMBER 12, 2025
13 amendments to it are on Voltaic, the latest dated 30 Jul 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025 — Regulation No. 6 of 2025 — was published in the Andhra Pradesh Gazette (Part II, Extraordinary No. 616, Amaravati, 12 September 2025) and signed by order of the Commission at Kurnool on 11 September 2025 (p1, p38). It is a principal, technology-by-technology tariff regulation: it fixes the normative parameters the Commission will use to determine Section 62 tariffs for grid-connected renewable energy projects commissioned during a five-year Control Period, and the procedure by which a developer asks for a project-specific tariff.
The preamble (pp1–4) grounds the Regulation in Sections 61, 62 and 86(1)(b) read with Section 181(2)(zd) of the Electricity Act, 2003, and records its triggers: the earlier 2008 tariff regulation and the 2015 wind regulation (whose applicable period was curtailed to two years and which ceased to be in force from 01.04.2017), an APTEL direction of 08.03.2022 to frame biomass and bagasse norms, the Supreme Court's judgment of 23.11.2022 requiring SERCs to frame regulations and criteria for choosing between Sections 62 and 63, paragraph 6.4(2) of the National Tariff Policy 2016, and a Government of Andhra Pradesh direction of 05.02.2025 under Section 108 asking APERC to adopt the AP Integrated Clean Energy Policy, 2024 and fix Section 62 tariffs for solar, wind, hybrid and pumped storage projects.
Clauses 1–4 (pp4–11) give the title, commencement, territorial extent and defined terms; state the scope of application (Section 62 determination where Section 63 competitive-bidding guidelines do not govern); and lay down eligibility criteria for each technology, based on new plant and machinery, MNRE-approved technologies, and technology-specific thresholds such as the minimum capacity share of one resource in a hybrid project.
Chapter 1, General Principles (clauses 5–10, pp12–14), fixes the Control Period; provides for case-by-case project-specific tariffs with the Regulation's norms (other than capital cost) acting as ceilings; sets the petition, fee, newspaper-notice and 120-day disposal procedure, including the duty to justify a project-specific tariff over competitive bidding; describes the tariff structure; and prescribes levelised tariff design and payment for over-generation.
Chapter 2, Financial Principles (clauses 11–22, pp14–19), carries the common financial parameters: contents of capital cost, debt-equity ratio, loan tenure and interest benchmark, depreciation, return on equity and income-tax pass-through, working capital and its interest, the hours-in-a-year convention, O&M escalation, rebate, late payment surcharge, treatment of grants, subsidies and incentives including accelerated depreciation, and recovery of statutory charges.
Chapters 3–13 (pp19–29) are the technology chapters — wind, small hydro, biomass with Rankine cycle, non-fossil-fuel cogeneration, solar PV / solar thermal / floating solar, biomass gasifier, biogas, refuse-derived-fuel municipal solid waste, renewable hybrid, renewable energy with storage, and pumped storage. Each follows the same pattern: capital cost (normative or project-specific), CUF/PLF, auxiliary consumption, station heat rate, gross calorific value, fuel price and escalation, and O&M expenses, plus tariff-shape rules for hybrid, storage and pumped storage projects.
Chapter 14 (pp29–30) covers interpretation, tariff agreed in deviation from the norms (capped at the normative levelised tariff), and the Commission's powers to dispense with requirements, relax provisions, remove difficulties, issue practice directions and amend the Regulation. The Appendix (pp31–38) contains the five forms used to file assumptions and compute fixed, variable and levelised tariff components.
Read with this
Amendments and corrections
- Dated 24 Feb 2025Regulation No.3 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No.1 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation
- Dated 11 Jul 2025Regulation No.4 of 2025 — Fourth Amendment to the Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013
- Dated 9 Oct 2025Licensees and Standards of Performance Regulation, 2004 — Sixth Amendment, 2025
- Dated 4 Dec 2025Regulation 8 of 2025 — Second Amendment
- Dated 4 Dec 2025Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025
- Dated 4 Dec 2025Regulation 11 of 2025 — First Amendment
- Dated 5 Dec 20251st Amendment through Reg No 12 of 2025
- Dated 5 Dec 2025Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons
- Dated 8 Jan 2026Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Errata
- Dated 8 May 2026Regulation No 03 of 2026 — Second Amendment
- Dated 8 May 2026Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order
- Dated 30 Jul 2026Regulation No.5 of 2026 — Fifth Amendment
Commencement notices and reasons
- Dated 11 Sep 2025RE Tariff Determination Regulation, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
Other copies of these documents (1)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.