Renewable Purchase Obligation and its Compliance Regulations, 2025 — Third Amendment
Amends the Renewable Power Purchase Obligation and its Compliance Regulations, 2012
- NOTIFICATION › GENERAL… to meet the shortfall in achievement of stipulated Wind renewable energy or Hydro renewable energy consumption. 6. The designated consumers who are open access consumers or consumers with Captive Power Plants shall fulfil their …
- NOTIFICATION › GENERALThe hydro renewable energy component shall be met only by energy produced from Hydro Power Projects [including Pump Storage Projects (PSPs) and Small Hydro Projects (SHPs)], commissioned after the 31st March, 2024: …
3 matching passages in this document
Grid Interactive Distributed Renewable Energy Net Metering, Group/Virtual Net Metering, Net Billing and Gross Metering Regulations, 2024
- 1. Short title and commencement › 2. Definitions and Interpretations… the basis of the applicable retail tariff by using a single bidirectional energy meter for net-metering at the point of supply; (aa) "Obligated Entity" means the entity mandated under clause (e) of sub-section (1) …
- 12. Renewable Purchase Obligation (RPO)… Renewable Purchase Obligation (RPO) 12.1. The quantum of electricity generated from the Renewable Energy Project of an eligible prosumer under Net Metering including Group Net Metering and Virtual Net Metering or Net-Billing/ Net Feed-In …
3 matching passages in this document
Terms and Conditions for Determination of Tariff and Formats for Tariff Filing Regulations, 2011
Replaced bya later regulation Voltaic does not hold- 11. Norms of Operation › Note"Storage Type power station" means a hydro electric power generating station associated with large storage capacity to enable variation of generation of power according to demand; …
- = AFC x 0.5 x NDM / NDY x ( PAFM / NAPAF ) (in Rupees) › (B) Energy Charges… Energy Charges: (1) The energy charge shall be payable by every beneficiary for the total energy scheduled to be supplied to the beneficiary, excluding free energy, if any, during the calendar month, on ex power plant basis, at the …
3 matching passages in this document
Green Energy Open Access (GEOA) and Methodology for Calculation of Charges Regulations, 2024
- 2. Definitions"GEOA" means the Green Energy Open Access (l) "GoAP" means the Government of Arunachal Pradesh. (m) "Green Energy" means the electrical energy from renewable sources of energy including hydro and storage (if the storage uses renewable …
- 2. Definitions… sources that produce/generate electrical energy from renewable sources of energy including, but not limited to Solar PV Power Project or Wind Power Project or Hybrid Power Project or Small Hydro Power Project or biomass, biofuel, urban …
3 matching passages in this document
Multi Year Tariff Regulations, 2024
- CHAPTER 1- PRELIMINARY › 1.3. Definitions"Scheduled Energy" means the quantum of energy scheduled by the State Load Dispatch Centre to be injected into the grid by a generating station for a given time period; (92) "Scheduled Generation" at any time for any period or time-block …
- 6.9. Non-Tariff Income › 6.11. Norms of operation for Thermal and Hydro Generating …… The norms for thermal generating stations and Pumped Storage Hydro Projects shall be approved by the Commission on case to case basis. (2) The following Normative annual plant availability factor (NAPAF) shall apply to hydro generating …
3 matching passages in this document
State Grid Code Regulations, 2025
- 1. GENERAL › CHAPTER 2"Energy Storage System (ESS)" in relation to the electricity system, means a facility where electrical energy is converted into any form of energy, which can be stored and subsequently reconverted into electrical energy and injected back …
- 10.4 Demarcation of Responsibilities › 10.5 Scheduling and Dispatch Procedure… the SLDC shall regulate the generation of Renewable energy power plants to maintain Grid security. (iii) Run-of-river power station with pondage and storage type power stations are designed to operate during peak hours to meet system …
3 matching passages in this document
State Grid Code Regulations, 2012
Replaced bya later regulation Voltaic does not hold- (2) Specifications of meters… The energy accounting and audit meter shall have data storage capacity for at least 35 days in a non-volatile memory. (4) Energy accounting and audit meters shall have facility to download the parameters through meter reading instruments …
- (2) Specifications of metersCumulative reactive energy (ii) Average power factor (iii) Time of use of energy (iv) Apparent power (v) Maximum demand (vi) Phase voltage and line currents (2) All the three phase meters shall have data storage capacity for at least 35 …
2 matching passages in this document
Arunachal Pradesh Framework for Resource Adequacy Regulations, 2024
- EXTRAORDINARY PUBLISHED BY AUTHORITY › Chapter 1 Preliminary… storage systems for energy shift, and demand response measures for managing the intermittency and variability of renewable energy sources. o. "Short term" means one year for development of demand forecast, generation resource plan, and …
- EXTRAORDINARY PUBLISHED BY AUTHORITY › 6. Long-term and Medium-term Demand Forecast… distributive energy resources, storage, and policies, which can impact econometric parameters, impact of national hydrogen mission. For each policy, a separate trajectory should be developed for each customer category. …
2 matching passages in this document
Arunachal Pradesh Electricity Supply Code, 2024
- 5.1.1. Requirement of Meters… new connection or for replacement of meter or for other purposes such as energy audit and interface meter. The useful life of the meter will be notified by the licensee at the time of installation after certification from accredited lab. …
- 6.1.3. Hearing in Case of Suspected Theft › 6.1.4. Assessment Bill for Theft of Electricity… Where it is established that there is a case of theft of energy based on the consumer's reply/hearing, the Authorised Officer shall assess the energy consumption as per the assessment formula given in Annexure 10.11 to this Code, …
3 matching passages in this document