Procurement of Energy Renewable Sources and its Compliance Regulations, 2021
- … (MGO) means Mini-Grid Operator as defined in OERC (Mini-Grid Renewable Energy Generation and Supply) Regulations, 2019. (n) MNRE means the Ministry of New and Renewable Energy, Government of India; …
- 4. Purchase Obligation from Renewable Sources… Provided further that large hydropower projects including pumped storage projects having capacity of more than 25 MW (LHPs) which came into commercial operation after 08.03.2019 will be considered as renewable energy source. …
3 matching passages in this document
Promotion of Renewable Energy through Green Energy Open Access Regulations, 2023
- PRELIMINARY › 5. Purchase Obligation from Renewable SourcesThe Green Energy purchased from distribution licensee/GRIDCO or from Renewable Energy sources other than distribution licensee/GRIDCO in excess of its Renewable Purchase Obligation (RPO) …
- PRELIMINARY › 5. Purchase Obligation from Renewable SourcesThere shall be a uniform renewable purchase obligation, on all obligated entities in the area of supply / operation of a distribution licensee. Any entity, whether obligated or not, may elect to generate, …
3 matching passages in this document
Draft Renewable Purchase Obligation Regulations, 2026
Draft- 6. Energy Storage Obligation… Energy Storage Obligation 6.1 The following percentage of total energy consumed shall be renewable energy along with/through storage as provided in Table-2 below: Table-2 Sl. No. …
- 1. SHORT TITLE AND COMMENCEMENT › 2. DEFINITIONS AND INTERPRETATION"Energy Storage Obligation" or "ESO" means the obligation of an obligated entity to source a portion of the energy from Energy Storage Systems established as standalone ESS or in combination with RE sources, …
3 matching passages in this document
Procurement of Energy from Renewable Sources and its Compliance Regulations, 2024 — Draft
Draft- NoteFinancial Year Storage (on Energy Basis) 2024-25 1.5% 2025-26 2.0% 2026-27 2.5% 2027-28 3.0% 2028-29 3.5% 2029-30 4.0% 4.8 The Energy Storage Obligation shall be calculated in energy terms as a percentage of …
- Note… to meet the shortfall in achievement of stipulated Wind Renewable Energy or Hydro Renewable Energy Consumption. 4.5 In case of Hybrid Sources, the power procured from the hybrid project may be used for fulfillment of Wind Renewable …
3 matching passages in this document
RCO, DRES and RE Linked Concepts Regulations, 2026 — Draft
Draft- ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK … › ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK …"Energy Storage Obligation" or "ESO" means the obligation of an obligated entity to source a portion of the energy from Energy Storage Systems established as standalone ESS or in combination with RE sources, …
- ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK … › 5. Renewable Consumption Obligation… 5.2 The obligation under the Wind energy component shall be met by energy produced from Wind Power Projects commissioned after 31st March, 2024. 5.3 The obligations under the Hydro energy component shall be met by energy produced from …
3 matching passages in this document
Procurement of Energy from Renewable Sources and its Compliance Regulations, 2021 — Revised Draft
Draft- 1. Short title, Commencement and Extent › 2. Definitions and InterpretationNew Large Hydro Project shall be large hydro including pump storage projects commissioned in India having capacity of more than 25 MW which come into commercial operation after 8th March 2019. (p) Non Solar Sources means Renewable Energy …
- 4. Purchase Obligation from Renewable Sources › Minimum quantum of electricity to be procured from …… Further, renewable power stored in any form of storage (Battery, Mechanical or Gravitational) and subsequently discharged to the grid from such storage shall be treated as renewable energy. …
3 matching passages in this document
Ancillary Services Regulations, 2026 — Draft
Draft- 7. Eligibility for an SRAS Provider… 7.1 A generating station or an entity having energy storage resources or an entity capable of providing demand response, on a standalone or aggregated basis, connected to the intra-State transmission system, shall be eligible to provide …
- ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK …… "Energy Storage" in relation to the electricity system, means a facility where electrical energy is converted into any other form of energy which can be stored, and subsequently reconverted into electrical energy; …
3 matching passages in this document
Distribution Licensees' Standards of Performance Regulations, 2025 — Draft
Draft- Guaranteed standards › 11.0 General provisions.… Encryption of consumer data during storage and transmission; c. Maintenance of secure audit logs and real-time monitoring; d. Periodic security audits and vulnerability assessments by CERT-In–empanelled auditors; and e. …
- 3.0 Objective › 4.0 Standards of Performance (SOP)… that a licensee shall achieve and maintain in the discharge of its obligations as a Licensee. 4.2 The Standards specified in the Schedule-II shall be the Overall Standards of Performance which the Licensee shall seek to achieve in the …