TNERC · Tamil Nadu Electricity Regulatory Commission
Grid Connectivity and Intra-State Open Access Regulations, 2014 — Amendment, 2022 — Draft
Draft of the amendments to the Tamil Nadu Electricity Commission (Grid Connectivity and Intra-State Open Access) Regulations 2014
Draft amendmentDated 26 Apr 2022TNERC/ISOA/11/2-…. dated -2022
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment published by the Tamil Nadu Electricity Regulatory Commission for public comment, proposing to substitute regulation 9(6) of the TNERC (Grid Connectivity and Intra-State Open Access) Regulations, 2014 (p1). It is expressly a draft: objections and suggestions were invited up to 15-4-2022 and the draft is to be taken up after thirty days from its publication on the TNERC website (p1).
The operative text (p1–2) restores a one-megawatt entry threshold for open access on the intra-state transmission system, keyed to the maximum power made available at any point of time rather than to contracted load, and subject to the Act, the Regulations, operational constraints, contracted demand and the terms and conditions of supply. A further proviso sets out how contracted demand is reckoned when a consumer takes open access from a wind or solar plant — as a percentage of the capacity utilisation factor (CUF) notified in the Commission's tariff orders for the plant's commissioning date — and the draft prints the CUF values to be used for plants commissioned from 7.10.2020 and from 16.10.2020, with worked illustrations for a 2 MW plant (p2).
The Explanatory Statement (p3–7) traces the proposal to a Government of Tamil Nadu policy directive under s.108, G.O. (Ms) No.37 dated 17.04.2018, obtained on TANGEDCO's request to align the regulation with the fifth proviso to s.42(2) of the Electricity Act 2003. It reproduces the Government's reasoning — revenue loss from consumers shifting to captive wheeling to avoid cross-subsidy surcharge, fixed-cost burden on the licensee, impact on other consumers, and the claimed absence of any justification now that the power deficit and R&C measures are over — and records the writ petitions and the Madras High Court's 19.8.2021 direction that the Commission hear the matter and decide the directive. It then records the Commission's 21.12.2021 decision to consult the public, its view that the direction carries a public-interest element, the history of the limit (raised above 1 MW by a 2010 amendment during the shortage), and its reasoning that the relaxation was a temporary concession and that restoring the limit is reasonable, including on grid-operation and load-forecasting grounds (p5–7).
The closing statement is meant to set the existing and amended texts side by side (p8–9).
Read with this
The regulation
- Dated 13 Mar 2014Grid Connectivity and Intra-State Open Access Regulations, 2014
Amendments and corrections
- Dated 16 Mar 2022Grid Connectivity and Intra State Open Access Regulations, 2014 — Amendment, 2022
- Dated 18 Sep 2025Changes some provisions: Terms and Conditions for Green Energy Open Access Regulations, 2025
Procedures and orders made under it
- Date not statedProcedure for Grant of Connectivity to the Distribution System, 33 kV and below — under Grid Connectivity and Intra State Open Access Regulations, 2014
- Date not statedProcedure for Grant of Connectivity to the Intra-State Transmission System
- Date not statedDetailed Procedure for Open Access in Transmission and Distribution System
Earlier drafts
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.