TNERC · Tamil Nadu Electricity Regulatory Commission
Grid Connectivity and Intra-State Open Access Regulations, 2014 — Priority for Adjustment of Energy — Draft Amendment, 2021
TAMIL NADU ELECTRICITY REGULATORY COMMISSION Draft Notification No. TNERC/ISOA/11/2-…. dated -2021. (Comments invited by 31-12-2021)
Draft amendmentDated 2 Dec 2021TNERC/ISOA/11/2-…. dated -2021
Draft
A proposal that has since been finalised as the Grid Connectivity and Intra State Open Access Regulations, 2014 — Amendment, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a TNERC draft notification, not a final amendment, proposing a new sub-regulation (2) after regulation 19(1) of the Tamil Nadu Electricity Regulatory Commission (Grid Connectivity and Intra-State Open Access) Regulations, 2014 (p1). The notice invites objections or suggestions by 31-12-2021 and says the draft will be taken up after 30 days from publication on the TNERC website (p1).
The operative text would set the order in which an open access consumer's draw is adjusted against energy from different sources, for each slot/time block and after losses. It expressly applies time-block adjustment to short-term inter-State open access including power exchange transactions, and to other transactions “as and when implemented” (p1). The sequence is split into non-captive, captive thermal-predominant and captive renewable-predominant categories (pp1–3).
For non-captive consumers, thermal comes first by agreement term, then renewable sources, then the distribution licensee; the renewable order runs solar, wind, bagasse co-generation and biomass, with a proviso that all renewables taken together follow agreement term (pp1–2). Captive thermal-predominant consumers start with captive thermal, then captive/RPO renewables, then third-party purchases in the non-captive order, then the distribution licensee. Captive RE-predominant consumers start with their captive renewable and thermal sources, then third-party purchases, then the distribution licensee. Within captive renewable blocks, biomass comes first, solar and wind are ordered by applicable tariff, wind is split by banking period, and bagasse follows (pp2–3). Illustrations show how the order works for mixed long-term and short-term purchases (pp2–4).
The Explanatory Statement says the proposal responds to TANGEDCO's petition in M.P. No.24 of 2021 and grounds the priority in renewable must-run status, RPO compliance, captive-use rules, duration-based access, banking and optimisation of power purchase cost (pp5–6). Pages 7–10 present a statement of the existing provision against the provision as amended.
Read with this
The regulation
- Dated 13 Mar 2014Grid Connectivity and Intra-State Open Access Regulations, 2014
Amendments and corrections
- Dated 16 Mar 2022Grid Connectivity and Intra State Open Access Regulations, 2014 — Amendment, 2022
- Dated 18 Sep 2025Changes some provisions: Terms and Conditions for Green Energy Open Access Regulations, 2025
Procedures and orders made under it
- Date not statedProcedure for Grant of Connectivity to the Distribution System, 33 kV and below — under Grid Connectivity and Intra State Open Access Regulations, 2014
- Date not statedProcedure for Grant of Connectivity to the Intra-State Transmission System
- Date not statedDetailed Procedure for Open Access in Transmission and Distribution System
Proposed changes (drafts with no final yet)
Earlier drafts
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.