TNERC · Tamil Nadu Electricity Regulatory Commission

Detailed Procedure for Open Access in Transmission and Distribution System

ProcedureDate not stated

Made under the Grid Connectivity and Intra-State Open Access Regulations, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 41 of 123. Check the regulator's original before you rely on it.

This document is the Detailed Procedure for Open Access in the Transmission and Distribution System of Tamil Nadu, prepared by TN SLDC under Regulation 43 of the TNERC (Grid Connectivity and Intra-State Open Access) Regulations, 2014, and approved by the Commission (p1). It is the operational handbook that turns the 2014 Regulations into step-by-step forms, time limits and agreements for anyone using the intra-State grid. Pages 1-3 are a table of contents; the operative text begins at p4.

Section 1 (p4) lays down general provisions: payment of intra-State transmission and wheeling charges alongside inter-State charges, adherence to the Act, Rules and Commission orders, and 15-minute-block energy accounting and settlement. It also sets out how captive generating plant status is verified against Rule 3 of the Electricity Rules, 2005. Section 2 (p4-6) sets out how to obtain the distribution licensee's consent — the nodals to whom applications go, the consent formats (1A/1B for applicants, 2A/2B from the DISCOM), the 3-working-day / 2-working-day processing clock, the mandatory nature of consent for all consumers and generators irrespective of voltage, and the CGP approval path through Formats 3A/3B/3C with scrutiny by the DISCOM nodal agency. It also mandates online processing within three months of issue and provides registration and relinquishment flow charts (p6-8).

Pages 9-34 are the proforma annexures: application and consent formats for generators and consumers, the CGP energy wheeling application and its document list, the Energy Wheeling Agreement (with 25 clauses on scheduling, losses, DSM, metering, CGP status, disputes and agreement period), the Energy Purchase Agreement (definitions, grid-connectivity conditions, rate, billing, payment security, arbitration, force majeure) and reporting Formats A/B and Annexure-I.

Section 3.0 (p35-41) begins the detailed access-grant procedure: eligibility and non-eligibility (outstanding dues, insolvency), criteria for granting open access including the no-augmentation rule for medium/short-term access, and the full long-term open access route — where to apply, application fees by capacity band and injection/drawal location, documents, bank guarantee requirements, application processing, concurrence timelines, agreement signing, and the deemed-consent provision for distribution licensee consent.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Scheduling and despatch

Read with this

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗