TNERC · Tamil Nadu Electricity Regulatory Commission
Grid Connectivity and Intra State Open Access Regulations, 2014 — Amendment, 2022
AMENDMENT TO THE TAMIL NADU ELECTRICITY REGULATORY COMMISSION (GRID CONNECTIVITY AND INTRA STATE OPEN ACCESS) REGULATIONS, 2014.
AmendmentDated 16 Mar 2022Published in the Gazette 21 Mar 2022TNERC/ISOA/11/2-1 dated 16-3-2022
Amends the Grid Connectivity and Intra-State Open Access Regulations, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a single-sub-regulation amendment by the Tamil Nadu Electricity Regulatory Commission to its 2014 Grid Connectivity and Intra-State Open Access Regulations, published in the Tamil Nadu Government Gazette of 21 March 2022 (p1). It inserts a new sub-regulation (2) after regulation 19(1) establishing one ranked sequence in which energy drawn by an open access consumer from multiple sources is to be adjusted — applied for each slot/time block and after adjustment of applicable losses (p1–2).
The sequence ranks power exchange transactions first (collective before bilateral), then third-party power purchases (biomass, bagasse-based co-generation, thermal, solar, wind), then captive sources in the same technology order with wind split into four sub-categories by REC/non-REC status and by one-month or twelve-month banking, and finally supply from the distribution licensee (p1–2). For captive wind, the amendment imports the monthly adjust-then-bank methodology already prescribed in the Commission's wind tariff orders (p2).
An Explanatory Statement on p3 gives the reasoning: it follows TANGEDCO's petition M.P. No. 24 of 2021 and a stakeholder-consulted draft, and rests on cost of generation, the shelf life of firm power that cannot be stored, and the banking facility available to each source (p3). It records that priority for windmills with one-month banking is subject to appeals pending before the Courts, and that adjustment by descending tariff for wind was settled in M.P. No. 14 of 2017 (p3). The regulations take effect from the date of Gazette notification (p3). A table comparing the existing and amended provisions appears on p4.
Read with this
The regulation
- Dated 13 Mar 2014Grid Connectivity and Intra-State Open Access Regulations, 2014
Amendments and corrections
- Dated 18 Sep 2025Changes some provisions: Terms and Conditions for Green Energy Open Access Regulations, 2025
Procedures and orders made under it
- Date not statedProcedure for Grant of Connectivity to the Distribution System, 33 kV and below — under Grid Connectivity and Intra State Open Access Regulations, 2014
- Date not statedProcedure for Grant of Connectivity to the Intra-State Transmission System
- Date not statedDetailed Procedure for Open Access in Transmission and Distribution System
Proposed changes (drafts with no final yet)
Earlier drafts
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.