Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Grid Connectivity and Intra State Open Access Regulations, 2014 — Amendment, 2022

AMENDMENT TO THE TAMIL NADU ELECTRICITY REGULATORY COMMISSION (GRID CONNECTIVITY AND INTRA STATE OPEN ACCESS) REGULATIONS, 2014.

AmendmentDated 16 Mar 2022Published in the Gazette 21 Mar 2022TNERC/ISOA/11/2-1 dated 16-3-2022

Amends the Grid Connectivity and Intra-State Open Access Regulations, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a single-sub-regulation amendment by the Tamil Nadu Electricity Regulatory Commission to its 2014 Grid Connectivity and Intra-State Open Access Regulations, published in the Tamil Nadu Government Gazette of 21 March 2022 (p1). It inserts a new sub-regulation (2) after regulation 19(1) establishing one ranked sequence in which energy drawn by an open access consumer from multiple sources is to be adjusted — applied for each slot/time block and after adjustment of applicable losses (p1–2).

The sequence ranks power exchange transactions first (collective before bilateral), then third-party power purchases (biomass, bagasse-based co-generation, thermal, solar, wind), then captive sources in the same technology order with wind split into four sub-categories by REC/non-REC status and by one-month or twelve-month banking, and finally supply from the distribution licensee (p1–2). For captive wind, the amendment imports the monthly adjust-then-bank methodology already prescribed in the Commission's wind tariff orders (p2).

An Explanatory Statement on p3 gives the reasoning: it follows TANGEDCO's petition M.P. No. 24 of 2021 and a stakeholder-consulted draft, and rests on cost of generation, the shelf life of firm power that cannot be stored, and the banking facility available to each source (p3). It records that priority for windmills with one-month banking is subject to appeals pending before the Courts, and that adjustment by descending tariff for wind was settled in M.P. No. 14 of 2017 (p3). The regulations take effect from the date of Gazette notification (p3). A table comparing the existing and amended provisions appears on p4.

Standard name
Open Access Regulations
Primary topics
Open access, Energy banking, Energy accounting and settlement

Read with this

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document