Skip to content

BERC · Bihar Electricity Regulatory Commission

Bihar Electricity Supply Code, 2007

CodeDated 31 Dec 2007Published in the Gazette 10 Jan 2008No. BERC/Regl-6/2006/529 dated The 31st December, 2007

8 amendments to it are on Voltaic, the latest dated 1 Jul 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software, from pages 1 to 30 of 113. Check the regulator's original before you rely on it.

The Bihar Electricity Supply Code, 2007 is BERC's principal distribution supply code, notified on 31 December 2007 and published in the Bihar Gazette on 10 January 2008 (p1). It comes into force from gazette publication (p7) and applies to every distribution licensee under s.14 of the Electricity Act 2003 and to consumers across Bihar (p7). The notification states it is made under the Electricity Act, ss.181(1)-(2) read with ss.50, 43(1), 44, 46, 47(4) and 56, and in compliance with two Ministry of Power Removal of Difficulties orders of June 2005 (p1).

The contents (pp2-6) map twelve chapters and eight annexures. Chapter 1 establishes title, extent, commencement and a standing Electricity Supply Code Review Panel with licensee, STU/transmission, consumer, generator and other stakeholder members, two-year terms, six-monthly meetings and consultation before amendments (pp7-8). Chapter 2 defines the Code's commercial and technical vocabulary, from consumer categories and contract demand to connected load, maximum demand, power factor and theft, and says tariff order meanings prevail on inconsistency (pp8-12). Chapter 3 fixes declared frequency and voltage levels, voltage-variation limits at the point of supply, contract-demand bands for LT/HT/EHT voltage, and leaves consumer classification to tariff orders (p13). A footnote records a corrigendum to the 6.6 kV conversion provision (p13).

Chapter 4, the largest chapter, governs new service connections (pp14-30). It states the licensee's duty to supply within one month of a completed application and to extend/upgrade its distribution system; specifies when consumers bear service-connection or extension costs; and requires a separate transformer at consumer cost for projected loads of 60 kW or more (pp14-15). It lays down the application, inspection, estimate, payment, agreement, testing and energisation process for LT and HT/EHT connections, with deemed acceptance if deficiencies are not intimated (pp16-22). It provides a no-dues certificate regime and public-demand recovery for outstanding electricity dues (p18). Category-specific sections cover multi-consumer/commercial complexes, housing colonies, group users, agriculture/irrigation pumpsets, public street lighting and temporary supply, including load-estimation tables for complexes and colonies and supervision-charge bands (pp20-30). The rest of the Code — Chapters 5-12 and Annexures 1-8.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document