Skip to content

BERC · Bihar Electricity Regulatory Commission

Bihar Electricity Supply Code, 2007 — 8th Amendment, 2024

Bihar Electricity Supply Code (8th Amendment), 2024

AmendmentDated 1 Jul 2025Published in the Gazette 21 Jul 2025BERC-02 dated 1 st July 2025

Amends the Bihar Electricity Supply Code, 2007.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Bihar Electricity Regulatory Commission gazette notification that makes the eighth amendment to the Bihar Electricity Supply Code, 2007 (p1). It is issued under s.181(1) and s.181(2)(X) read with s.50 of the Electricity Act, 2003, and BERC explains it as a response to changes the Ministry of Power, Government of India, identified in the Supply Code and related regulations for 'Ease of Living' (p1). It extends to the whole State of Bihar and comes into force from the date of publication in the Bihar Gazette (p1); the gazette is dated Monday, 21 July 2025, while the notification itself is dated 1 July 2025 (p1).

Paragraph 1 gives the short title, extent and commencement. The operative content is Paragraph 2, which amends Chapter 4 of the Code only, and is presented as comparative tables of 'Existing Clause' against 'Modified Clause' rather than as clean revised text. The first table (p2) modifies Clause 4.1 — the licensee's obligation to supply, and how it applies where distribution mains must be extended or a new substation commissioned. The second, much longer table (p2–5, headed Clause 4.11 although the page-2 caption repeats '4.1') rewrites the application regime for new connections and reduction of load: application forms and their annexures, online submission through a web portal or mobile app alongside hard-copy filing, registration and acknowledgement, when an application counts as complete, an application-tracking mechanism, the documents required for small loads, whether a separate agreement is needed, consequences where the licensee fails to supply, and specification of the cost of connection in electrified areas (p2–5).

The document is signed by Secretary Nadeem Ahmad (p5).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply, Connection and miscellaneous charges

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document