This is a Bihar Electricity Regulatory Commission gazette notification that makes the eighth amendment to the Bihar Electricity Supply Code, 2007 (p1). It is issued under s.181(1) and s.181(2)(X) read with s.50 of the Electricity Act, 2003, and BERC explains it as a response to changes the Ministry of Power, Government of India, identified in the Supply Code and related regulations for 'Ease of Living' (p1). It extends to the whole State of Bihar and comes into force from the date of publication in the Bihar Gazette (p1); the gazette is dated Monday, 21 July 2025, while the notification itself is dated 1 July 2025 (p1).
Paragraph 1 gives the short title, extent and commencement. The operative content is Paragraph 2, which amends Chapter 4 of the Code only, and is presented as comparative tables of 'Existing Clause' against 'Modified Clause' rather than as clean revised text. The first table (p2) modifies Clause 4.1 — the licensee's obligation to supply, and how it applies where distribution mains must be extended or a new substation commissioned. The second, much longer table (p2–5, headed Clause 4.11 although the page-2 caption repeats '4.1') rewrites the application regime for new connections and reduction of load: application forms and their annexures, online submission through a web portal or mobile app alongside hard-copy filing, registration and acknowledgement, when an application counts as complete, an application-tracking mechanism, the documents required for small loads, whether a separate agreement is needed, consequences where the licensee fails to supply, and specification of the cost of connection in electrified areas (p2–5).
The document is signed by Secretary Nadeem Ahmad (p5).
Read with this
The regulation
- Dated 31 Dec 2007Bihar Electricity Supply Code, 2007
Amendments and corrections
- Dated 16 Aug 2010Bihar Electricity Supply Code, 2007 — 1st Amendment, 2010
- Dated 29 Mar 2012Bihar Electricity Supply Code, 2007 — Second Amendment, 2012
- Dated 28 Feb 2013Bihar Electricity Supply Code, 2007 — 3rd Amendment, 2013
- Dated 18 May 2015Bihar Electricity Supply Code, 2007 — 4th Amendment, 2015
- Dated 25 Feb 2016Bihar Electricity Supply Code, 2007 — 5th Amendment, 2016
- Dated 14 Mar 2020Bihar Electricity Supply Code, 2007 — 6th Amendment, 2020
- Dated 28 Jul 2023Bihar Electricity Supply Code, 2007 — Seventh Amendment, 2023
Earlier drafts
- Dated 31 Dec 2007Bihar Electricity Supply Code, 2007 — 8th Amendment, 2024
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.