Bihar Electricity Supply Code, 2007 — 8th Amendment, 2024

Bihar Electricity Supply Code (8th Amendment), 2024

Public notice on a draftDated 31 Dec 2007Published in the Gazette 10 Jan 2008BERC Case No.- SMP-18/2024

Draft

The draft has since been finalised as the Bihar Electricity Supply Code, 2007 — 8th Amendment, 2024.

Public notice on a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Bihar Electricity Regulatory Commission's 8th amendment to the Bihar Electricity Supply Code, 2007, issued in BERC Case No. SMP-18/2024, modifies Chapter 4 of the Code. It is made under Sections 181(1) and 181(2)(X) read with Section 50 of the Electricity Act, 2003 and Regulation 12.6 of the Code, in response to Ministry of Power suggestions for "Ease of living" (p1). The short title clause names it the Bihar Electricity Supply Code (8th Amendment), 2024; it extends to the whole State and comes into force on publication in the Bihar Gazette (p1). The original Code was notified on 31 December 2007 and gazetted on 10 January 2008 (p1).

The amendment first replaces Clause 4.1, dealing with the distribution licensee's obligation to supply, including where supply requires extension of distribution mains or new substations, and with time limits for new or modified connections in municipal and rural areas (p1). The modification is presented as an existing-versus-modified text table.

The bulk of the amendment replaces Clause 4.11 with sub-clauses (1)-(12) (pp2–3). These require the distribution licensee to publish a detailed procedure for new and temporary connections, load reduction or load change, and an address for online submission; to provide application forms for all connection types and modifications; to create online application forms; to allow electronic application through a web portal or mobile app; to acknowledge hard-copy and online applications with a registration number; and to provide application tracking through web, mobile or SMS (pp2–3). For new connections up to a load of 10 kW, only two mandatory documents are required — identity proof and proof of ownership or occupancy, or another address proof; beyond 10 kW, existing Clause 4.13(A) and 4.13(B) continue (p3). If an agreement is needed, it must be part of the application form, with no separate agreement form (p3). Failure to supply within Clause 4.1 timelines attracts a per-day penalty (p3). For electrified areas up to 150 kW load, the licensee must specify connection charges based on load, category and average cost, avoiding site inspection and individual demand estimation; those charges take effect after Commission approval and demand charges may be paid at application (p3).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document