Bihar Electricity Supply Code, 2007 — 5th Amendment, 2016

5 th Amendment to Bihar Electricity Supply Code, 2007

AmendmentDated 25 Feb 2016Published in the Gazette 26 Feb 2016BERC Case No.- 27/2015 dated 25th February, 2016

Amends the Bihar Electricity Supply Code, 2007.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Bihar Electricity Regulatory Commission's fifth amendment to the Bihar Electricity Supply Code, 2007 was notified on 25 February 2016 and published in the Bihar Gazette Extraordinary on 26 February 2016, from which date it comes into force; it extends to the whole State of Bihar (p1). The preamble recites the original Code and its four earlier amendments (p1).

The amendment touches five provisions. Clause 3.4 is substituted with a table tying supply voltage to minimum and maximum contract demand from 230 V up to 220 kV, plus a choice of voltage for smaller LT agriculture and LT industrial consumers (p1–2). Clause 4.11 replaces the LT connection application form in Annexure-1 with a Hindi version (Annexure-1) and an English version (Annexure-1A) (p2; forms at pp5–6 and pp11–14).

Chapter 7 gains new sub-clauses 7.4(i) and 7.4(j): the licensee must notice a demand-based-tariff consumer whose recorded demand repeatedly exceeds contract demand, and a connected-load-based consumer whose load exceeds sanctioned load, and may disconnect after further notice if the consumer does not regularise or limit drawal, with an option to revise the contract demand or sanctioned load with the consumer's consent (p2). Clause 7.11(3) is substituted so that a contract-demand enhancement application cannot be refused for the licensee's arrears while the connection is live, and a sentence is deleted from Clause 7.15(3) (p2–3).

Chapter 9 changes are billing-facing: the first row of the Clause 9.1 reading-and-billing chart (Kutir Jyoti) is replaced (p3); Clause 9.15 gains a rule that a meter reader's report cannot override the MRI report or an accredited-laboratory report (p3); new sub-clause 9.20(cc) requires total supply hours in the billing cycle to be shown on the bill where the meter can record them (p3); and Clause 9.23 gains an obligation to give consumers, on request, arrears and DPS details with period and amount (p3).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document