BERC · Bihar Electricity Regulatory Commission
Bihar Electricity Supply Code, 2007 — 5th Amendment, 2016
5 th Amendment to Bihar Electricity Supply Code, 2007
AmendmentDated 25 Feb 2016Published in the Gazette 26 Feb 2016BERC Case No.- 27/2015 dated 25th February, 2016
Amends the Bihar Electricity Supply Code, 2007.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Bihar Electricity Regulatory Commission's fifth amendment to the Bihar Electricity Supply Code, 2007 was notified on 25 February 2016 and published in the Bihar Gazette Extraordinary on 26 February 2016, from which date it comes into force; it extends to the whole State of Bihar (p1). The preamble recites the original Code and its four earlier amendments (p1).
The amendment touches five provisions. Clause 3.4 is substituted with a table tying supply voltage to minimum and maximum contract demand from 230 V up to 220 kV, plus a choice of voltage for smaller LT agriculture and LT industrial consumers (p1–2). Clause 4.11 replaces the LT connection application form in Annexure-1 with a Hindi version (Annexure-1) and an English version (Annexure-1A) (p2; forms at pp5–6 and pp11–14).
Chapter 7 gains new sub-clauses 7.4(i) and 7.4(j): the licensee must notice a demand-based-tariff consumer whose recorded demand repeatedly exceeds contract demand, and a connected-load-based consumer whose load exceeds sanctioned load, and may disconnect after further notice if the consumer does not regularise or limit drawal, with an option to revise the contract demand or sanctioned load with the consumer's consent (p2). Clause 7.11(3) is substituted so that a contract-demand enhancement application cannot be refused for the licensee's arrears while the connection is live, and a sentence is deleted from Clause 7.15(3) (p2–3).
Chapter 9 changes are billing-facing: the first row of the Clause 9.1 reading-and-billing chart (Kutir Jyoti) is replaced (p3); Clause 9.15 gains a rule that a meter reader's report cannot override the MRI report or an accredited-laboratory report (p3); new sub-clause 9.20(cc) requires total supply hours in the billing cycle to be shown on the bill where the meter can record them (p3); and Clause 9.23 gains an obligation to give consumers, on request, arrears and DPS details with period and amount (p3).
Read with this
The regulation
- Dated 31 Dec 2007Bihar Electricity Supply Code, 2007
Amendments and corrections
- Dated 16 Aug 2010Bihar Electricity Supply Code, 2007 — 1st Amendment, 2010
- Dated 29 Mar 2012Bihar Electricity Supply Code, 2007 — Second Amendment, 2012
- Dated 28 Feb 2013Bihar Electricity Supply Code, 2007 — 3rd Amendment, 2013
- Dated 18 May 2015Bihar Electricity Supply Code, 2007 — 4th Amendment, 2015
- Dated 14 Mar 2020Bihar Electricity Supply Code, 2007 — 6th Amendment, 2020
- Dated 28 Jul 2023Bihar Electricity Supply Code, 2007 — Seventh Amendment, 2023
- Dated 1 Jul 2025Bihar Electricity Supply Code, 2007 — 8th Amendment, 2024
Earlier drafts
- Dated 31 Dec 2007Bihar Electricity Supply Code, 2007 — 8th Amendment, 2024
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.