BERC · Bihar Electricity Regulatory Commission
Bihar Electricity Supply Code, 2007 — 6th Amendment, 2020
6th Amendment to Electricity Supply Code
AmendmentDated 14 Mar 2020Published in the Gazette 16 Mar 2020No-BERC-Case No. 30/2016 dated 14th March 2020
Amends the Bihar Electricity Supply Code, 2007.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Sixth Amendment to the Bihar Electricity Supply Code, 2007, made by the Bihar Electricity Regulatory Commission in Case No. 30/2016 and published in the Bihar Gazette of Monday 16 March 2020 (notification dated 14 March 2020, p1). It is not a fresh code: it substitutes, adds or deletes specific clauses of the 2007 Code and takes effect from the date of gazette publication (p2). The preamble recites the original 2007 notification and the five earlier amendments (p1).
Chapter 1 restates the short title, extent over the whole State of Bihar and applicability to all distribution licensees supplying electricity under s.14 of the Act and to their consumers (p1–2). Chapter 2 replaces the definition of maximum demand (p2). Chapter 3 replaces clause 3.4, re-setting which supply voltage applies to which contract-demand band and giving LT agriculture and LT industrial consumers of a small load an option of voltage (p2).
Chapter 4 rewrites the new-connection application clause — online through Discom web portals or offline in prescribed forms (Annexure-1 for LT, Annexure-2 for HT), which licensees must host on their websites — fixes acknowledgement and shortcoming-intimation timelines, adds a new clause allowing Discoms to supply and install consumer-requested transformers on rental basis (rent as per the tariff order) with responsibility rules if the transformer is damaged, and caps supervision charges at 2.5% of estimated cost where a government department itself shifts distribution infrastructure for a public-interest project such as a road or bridge (p2–3).
Chapter 6 rewrites wiring and connected-load provisions: licensed contractor wiring and contractor test report (Annexure-3), deletion of the Indian Electricity Rules, 1956 references in clauses 6.2 and 6.4, deletion of clause 6.3, and revised clauses 6.37, 6.39 and 6.40 on how connected load is determined, verified, and re-rated with an approved engineering institute as final arbiter (p3–4).
Chapter 7 covers service-connection matters: action when connected load exceeds sanctioned load (notice, a 30-day response window, a further 15-day disconnection notice, and possible sanctioned-load revision), application requirements for alteration, a proviso exempting demand-based-tariff consumers from connected-load verification, the compulsory agreement period and notice periods by consumer category with charges for early termination, and the initial security deposit table plus annual review of security with a 20% variation trigger (p4–6). Chapter 9 substitutes the clause on how bills may be sent, permitting hand delivery or electronic means (p6–7). It ends with the Secretary's order (p7).
Read with this
The regulation
- Dated 31 Dec 2007Bihar Electricity Supply Code, 2007
Amendments and corrections
- Dated 16 Aug 2010Bihar Electricity Supply Code, 2007 — 1st Amendment, 2010
- Dated 29 Mar 2012Bihar Electricity Supply Code, 2007 — Second Amendment, 2012
- Dated 28 Feb 2013Bihar Electricity Supply Code, 2007 — 3rd Amendment, 2013
- Dated 18 May 2015Bihar Electricity Supply Code, 2007 — 4th Amendment, 2015
- Dated 25 Feb 2016Bihar Electricity Supply Code, 2007 — 5th Amendment, 2016
- Dated 28 Jul 2023Bihar Electricity Supply Code, 2007 — Seventh Amendment, 2023
- Dated 1 Jul 2025Bihar Electricity Supply Code, 2007 — 8th Amendment, 2024
Earlier drafts
- Dated 31 Dec 2007Bihar Electricity Supply Code, 2007 — 8th Amendment, 2024
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.