BERC · Bihar Electricity Regulatory Commission

Bihar Electricity Supply Code, 2007 — 4th Amendment, 2015

Bihar Electricity Supply Code (4 Amendment), 2015

AmendmentDated 18 May 2015Published in the Gazette 19 May 2015

Amends the Bihar Electricity Supply Code, 2007.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Bihar Electricity Supply Code (4th Amendment), 2015 is a short amending instrument from the Bihar Electricity Regulatory Commission that rewrites named clauses of the Bihar Electricity Supply Code, 2007 and republishes three annexures in amended form. It is notified on 18 May 2015, the Gazette carrying it is dated 19 May 2015 (p1), and by its own terms it extends to the whole State of Bihar and comes into force from the date of publication in the Bihar Gazette (p1).

The changes run across three themes. First, new connections and arrears: the third proviso to clause 4.1 is replaced so that arrears against a previous owner, occupier or tenant cannot block a new connection; dues are to be recovered under the Bihar and Orissa Public Demands Recovery Act, 1914 or moved to another running account of the defaulting consumer after adjusting the security deposit and interest, on fifteen days' notice. Sub-divided premises are dealt with pro-rata by area, and refusal is allowed only where the applicant is an associate or relative of, or controls, the defaulter — after a hearing and a reasoned order within a month (p1–2).

Second, connected load and contract demand: clauses 6.37 and 7.1 are substituted, splitting LT consumers into those without and with a maximum demand indicator, defining billing demand as the higher of contract demand or recorded demand, excusing demand-based consumers from connected-load verification, and requiring the licensee to install a load arrestor up to 150% of contracted load (p2–3).

Third, metering, billing and recovery: chapter 8 gains a new sub-clause on meter seals, seal tampering and the evidence needed before booking theft; clause 9.16 is replaced with rules for defective, burnt or stolen meters and for assessment of consumption until replacement, including first-month and new-consumer cases; clause 9.19 allows e-mail/SMS billing for high-value HT consumers; chapter 10 adds a mandatory NEFT/RTGS payment route and a recover-the-dues clause (p3–4).

The annexures reissue the domestic connected-load determination form and its explanation (p5–6), a typical appliance rating table (p6–7), and the assessment formula, load-factor chart and rules for unauthorised use and theft of electricity (p7–10).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply, Metering

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document