Skip to content

BERC · Bihar Electricity Regulatory Commission

Bihar Electricity Supply Code, 2007 — 1st Amendment, 2010

1st Amendment to Bihar Electricity Supply Code, 2007

AmendmentDated 16 Aug 2010Published in the Gazette 18 Aug 2010

Amends the Bihar Electricity Supply Code, 2007.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Bihar Electricity Regulatory Commission's first amendment to the Bihar Electricity Supply Code, 2007, was notified on 16 August 2010 and published in the Bihar Gazette (Extraordinary) on 18 August 2010 (p1). It amends the principal Code in seven clauses and replaces two annexures, takes effect from the date of gazette publication, and applies to the whole of Bihar (p1).

The operative clauses (p1–2) reach six chapters. Chapter 2 gains a conversion rule so that energy-consuming devices rated in kVA or HP can be expressed in kW for connected-load purposes (p1). Chapter 5's clause on defective or burnt meters is cross-referred to the Code's own clause 8.20 (p2). Chapter 6 amends Annexure 4 on connected load (p2). Chapter 7 gains a new sub-clause allowing a consumer to shift a connection to another premises in the same billing area, conditional on technical feasibility, clearance of dues, shifting cost and specified limits on transformer spare capacity and existing load (p2). Chapter 11's clause is substituted outright, replacing the earlier provision with a "Voluntary Declaration of Tampered Meter" amnesty scheme that a licensee may run for a limited period with the Commission's prior approval, with rules on publicity, exclusions for premises already checked, meter replacement and who bears its cost, assessment at a fraction of the section 126 bill, default consequences and one-time availability (p2).

The annexures carry the working detail. Annexure 4 (p3) is the domestic connected-load determination form with counting rules — spare points, defective appliances, seasonal treatment of geysers, room heaters and air-conditioners, and rounding. Annexure 4(1) (p4) is a table of typical power ratings for domestic appliances. Annexure 7 (p5–7) substitutes the whole methodology for assessing energy charges in unauthorised use and theft: an assessment formula, a load-factor chart by consumer category, a special treatment of HT connected load, and separate assessment rules for unauthorised use and for theft, including how meter findings map to section 126 versus section 135 proceedings.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Theft and unauthorised use, New connections and load changes

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document