Skip to content

BERC · Bihar Electricity Regulatory Commission

Bihar Electricity Supply Code, 2007 — Second Amendment, 2012

2 nd Amendment to Bihar Electricity Supply Code 2007

AmendmentDated 29 Mar 2012Published in the Gazette 29 Mar 2012BERC–Regulation 6/06 dated The 29th March, 2012

Amends the Bihar Electricity Supply Code, 2007.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to the Bihar Electricity Supply Code, 2007, made by the Bihar Electricity Regulatory Commission and published in the Bihar Gazette (Extraordinary) on 29 March 2012 (p1). It is a short, clause-by-clause amendment in four parts with an annexed affidavit format.

The amendment first settles a hierarchy question: where the Code and the tariff order in force are inconsistent, the Code's provisions and meanings prevail (p1). It then restates the position on voltage of supply by contract demand, giving LT agriculture and LT industrial consumers with load between 2 KW & 5 KW the option of supply at 230 volts or 400 volts (p2).

Chapter 4 is opened up to occupants of encroached government, semi-government and public land — roadside vendors, shops, jhuggi-jhopari and slum settlers — who may take a new connection without proof of ownership by filing the prescribed application, a photo identity document as proof of occupancy, an affidavit in Annexure 1-A and the required charges; release of supply confers no legal right over the premises (p2, p4-5).

The Chapter 7 changes are consumer-service measures: revival of a permanently disconnected connection where the licensee never removed the service line (p2-3), deemed sanction of an applied load enhancement after thirty days for DS and NDS consumers (p3), and instalment payment of connection dues, with unpaid instalments transferable to the new connection (p3). Annexure 1-A sets out the affidavit undertakings on outstanding dues, distance from the LT pole, recovery of shortfalls and waiver of compensation claims (p4-5).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document