MPERC · Madhya Pradesh Electricity Regulatory Commission
Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — First Amendment, 2023
Madhya Pradesh Electricity Regulatory Commission (Co Generation and Generation of Electricity from Renewable Sources of Energy) (Revision-II) Regulations 2021 (First Amendment) [ARG-33(II)(i) of 2023]
AmendmentDated 16 Jan 2023MPERC/2023/160 dated 16th January 2023
Amends the Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2021 — Revision-II.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the First Amendment to MPERC's 2021 Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations. Issued in Bhopal on 16 January 2023 (p1), it extends to the whole of Madhya Pradesh and comes into force on publication in the Madhya Pradesh Gazette; the Gazette date is not printed (p1).
Regulation 2 is rewritten first (p1–2). The amendment inserts 'Entity' — a consumer with contracted demand or sanctioned load of 100 kW or more, except captive consumers, who have no load limit — and a broad 'Green Energy' definition covering renewable energy, hydro, storage and green hydrogen/ammonia. It also recasts 'Obligated Entity' to include distribution licensees, captive users and open access consumers, and updates the definition of a renewable-energy-based captive generating plant.
Regulation 3 is then substantially substituted (p2–5). The amendment sets a financial-year-wise renewable purchase obligation (RPO) trajectory for FY2022-23 to FY2029-30, split into Wind RPO, Hydro Purchase Obligation (HPO), Other RPO and Total RPO (p2). Wind RPO is met from projects commissioned after 31 March 2022 and specified excess older wind; HPO from hydro, pumped storage and small hydro commissioned on or after 8 March 2019 up to 31 March 2030; and Other RPO from any other RE project (p3). It also lays down how free power from hydro projects can be used for HPO, annual true-up, treatment of shortfalls and future notification of the post-2030-31 HPO trajectory (p3–4). An energy storage obligation trajectory from FY2023-24 to FY2029-30 is introduced, with storage counting towards RPO only where the stored energy is renewable (p4).
New Regulations 3.8(A) to 3.8(C) allow any entity, obligated or not, to procure green energy by own generation, open access, discom requisition, captive use, green hydrogen/ammonia purchase or other sources; provide for green certificates from the discom; and allow the Commission to introduce consumer green ratings (p5–7). Finally, Regulation 10.1 on banking of renewable energy is substituted with monthly banking conditions, permitted quantum and no carry-forward, and 'additional surcharge' is omitted from Regulation 11.2(d) (p7).
Read with this
The regulation
Amendments and corrections
- Dated 24 Jan 2023Corrigendum Notice, 24th January 2023
- Dated 31 Mar 2023Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Second Amendment, 2023
- Dated 26 Jul 2023Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Third Amendment, 2023
- Dated 4 Mar 2025Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fourth Amendment, 2025
- Dated 20 Mar 2026Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026
- Dated 4 Aug 2026Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations 2021 — Sixth Amendment, 2026
Other copies of these documents (1)
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.