MPERC · Madhya Pradesh Electricity Regulatory Commission
Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2021 — Revision-II
Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2021(Revision-II) {RG- 33(II) of 2021}
RegulationDated 2 Nov 2021No. 1693/MPERC-2021 dated 2nd November 2021
6 amendments to it are on Voltaic, the latest dated 4 Aug 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MPERC's principal, state-wide regulation on cogeneration and renewable energy generation — the Revision-II text notified on 2 November 2021 as No. 1693/MPERC-2021, issued under sections 181, 61(h), 66 and 86(1)(e) of the Electricity Act 2003 and applying to the whole of Madhya Pradesh (p1). It comes into force from the date of Gazette publication, though no Gazette date is printed (p1).
Definitions and Part A (pp1–12) set the vocabulary (Obligated Entity, RPO, cogeneration, renewable energy with storage and hybrid projects, RE-based captive plant, State and Central Agency, Year) and then the operative regime: the year-on-year minimum renewable purchase trajectory for obligated entities, with solar and non-solar sub-targets and limited interchangeability between them (p4); relaxation for force majeure (p5); and a special rule pegging captive users' RPO to the plant's commissioning date (p4–5). Regulation 3.6–3.9 routes procurement through MPPMCL on behalf of state distribution licensees, with allocation in proportion to prior-year energy input, and sets the PPA/wheeling-agreement process with timelines (p5–6). Regulation 4 covers PPA duration and prior Commission approval; Regulation 5 covers connectivity voltage, evacuation-cost ownership and metering; Regulation 6 open access eligibility; Regulation 7 exemptions from merit-order dispatch; Regulation 8 drawal for start-up and auxiliaries (pp6–8). Regulation 9 ties payment, contract-demand reduction, forecasting/scheduling/DSM and open-access charges to other MPERC instruments. Regulation 10 creates the banking facility, and Regulation 11 governs surplus-power sales by RE captive plants, energy accounting and settlement rates, cross-subsidy/rebate treatment of captive consumers, and registration of RE captive plants with the distribution licensee (pp8–12).
Part B (pp12–14) is compliance machinery: reservation of RPO by source, recognition of CERC RECs, the State Agency's designation, data collection, quarterly publication and reporting, and the consequences of default — a separate fund, certificate purchase, licence breach, penalty under section 142 and case-by-case carry-forward. Part C (p15) contains amendment/dispute powers, the override of contrary prior tariff orders and regulations, powers to issue directions and remove difficulties, and the supersession of the 2010 Revision-I regulations.
Read with this
Amendments and corrections
- Dated 16 Jan 2023Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — First Amendment, 2023
- Dated 24 Jan 2023Corrigendum Notice, 24th January 2023
- Dated 31 Mar 2023Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Second Amendment, 2023
- Dated 26 Jul 2023Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Third Amendment, 2023
- Dated 4 Mar 2025Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fourth Amendment, 2025
- Dated 20 Mar 2026Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026
- Dated 4 Aug 2026Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations 2021 — Sixth Amendment, 2026
Other copies of these documents (1)
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.