MPERC · Madhya Pradesh Electricity Regulatory Commission
Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Second Amendment, 2023
Madhya Pradesh Electricity Regulatory Commission (Co-Generation and Generation of Electricity from Renewable Sources of Energy) (Revision-II) Regulations 2021 (Second Amendment) [ARG-33 (II) (ii) of 2023]
AmendmentDated 31 Mar 2023No. MPERC / 2023/693 dated 31st March 2023
Amends the Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2021 — Revision-II.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A two-page amending instrument issued by the Madhya Pradesh Electricity Regulatory Commission on 31 March 2023 (p1). It amends the MPERC (Co-Generation and Generation of Electricity from Renewable Sources of Energy) (Revision-II) Regulations 2021 [RG-33(II) of 2021] — called the Principal Regulations — and extends to the whole of Madhya Pradesh, coming into force from the date of publication in the MP Gazette, which is not printed (p1).
Clause 2 inserts a new sub-clause into the definitions in Regulation 2, giving "Banking Cycle" the same meaning as in the MPERC (Methodology for determination of Open Access charges and Banking charges for Green Energy Open Access consumers) Regulations 2023 (G-46 of 2023), as amended from time to time — so the definition is borrowed rather than set out here (p1–2).
Clause 3 substitutes sub-clause (i) of clause (c) of Regulation 3.8(A), restating what a consumer may elect when buying green energy: a percentage of consumption or the whole of it, requisitioned through the distribution licensee, with flexibility to requisition Wind, Hydro and Other Categories separately (p2).
Clause 4 rewrites the banking rules in Regulation 10.1(ii). The substituted first proviso stops credit for banked energy being carried into later banking cycles and requires adjustment within the same cycle against off-peak and peak injection, with those periods to be fixed by the Commission in its Retail Supply Tariff order (p2). Three added provisos allow peak-period banked energy to be drawn in peak or off-peak slots but off-peak banked energy only in off-peak slots, on 15-minute time blocks, against banking charges determined under G-46 of 2023; require the licensee to reconcile banking charges at each financial year end on actual power-purchase cost and claim any extra through a separate petition filed with the truing-up petition of the following year's Retail Supply Tariff; and treat un-utilised surplus banked energy as lapsed at the end of each banking cycle, with Renewable Energy Certificates available to the generating station for the lapsed quantum (p2).
Read with this
The regulation
Amendments and corrections
- Dated 16 Jan 2023Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — First Amendment, 2023
- Dated 24 Jan 2023Corrigendum Notice, 24th January 2023
- Dated 26 Jul 2023Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Third Amendment, 2023
- Dated 4 Mar 2025Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fourth Amendment, 2025
- Dated 20 Mar 2026Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026
- Dated 4 Aug 2026Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations 2021 — Sixth Amendment, 2026
Other copies of these documents (1)
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.