MPERC · Madhya Pradesh Electricity Regulatory Commission
Corrigendum Notice, 24th January 2023
Corrigendum Notice
CorrigendumDated 24 Jan 2023No.216 MPERC/ 2023 dated 24th January 2023
Corrects the Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2021 — Revision-II or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page corrigendum issued by the Madhya Pradesh Electricity Regulatory Commission from Bhopal on 24 January 2023 (p1). It corrects the Hindi and English versions of notification no. 160 dated 16 January 2023 — the First Amendment to the MPERC (Co-Generation and Generation of Electricity from Renewable Sources of Energy) (Revision-II) Regulations 2021 — which was published at page 13, Part 4 of the Madhya Pradesh Gazette on 20 January 2023 (p1).
The error is confined to the Table under Regulation 3.1, where the Total RPO for Financial Year 2023-24 was printed incorrectly. The corrigendum directs that the Total RPO for FY 2023-24 in that Table "shall be read as 27.39% instead of 26.89%" (p1).
Nothing else in the parent amendment is altered. The corrigendum itself states no effective date, does not name the obligated entities, and does not reproduce the Table; anyone needing the year-wise RPO trajectory or its category split must go back to notification no. 160 and the parent 2021 Regulations.
Read with this
The regulation
Amendments and corrections
- Dated 16 Jan 2023Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — First Amendment, 2023
- Dated 31 Mar 2023Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Second Amendment, 2023
- Dated 26 Jul 2023Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Third Amendment, 2023
- Dated 4 Mar 2025Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fourth Amendment, 2025
- Dated 20 Mar 2026Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026
- Dated 4 Aug 2026Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations 2021 — Sixth Amendment, 2026
Other copies of these documents (1)
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.