Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Corrigendum Notice, 24th January 2023

Corrigendum Notice

CorrigendumDated 24 Jan 2023No.216 MPERC/ 2023 dated 24th January 2023

Corrects the Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2021 — Revision-II or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page corrigendum issued by the Madhya Pradesh Electricity Regulatory Commission from Bhopal on 24 January 2023 (p1). It corrects the Hindi and English versions of notification no. 160 dated 16 January 2023 — the First Amendment to the MPERC (Co-Generation and Generation of Electricity from Renewable Sources of Energy) (Revision-II) Regulations 2021 — which was published at page 13, Part 4 of the Madhya Pradesh Gazette on 20 January 2023 (p1).

The error is confined to the Table under Regulation 3.1, where the Total RPO for Financial Year 2023-24 was printed incorrectly. The corrigendum directs that the Total RPO for FY 2023-24 in that Table "shall be read as 27.39% instead of 26.89%" (p1).

Nothing else in the parent amendment is altered. The corrigendum itself states no effective date, does not name the obligated entities, and does not reproduce the Table; anyone needing the year-wise RPO trajectory or its category split must go back to notification no. 160 and the parent 2021 Regulations.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document