Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026

Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations 2021(Fifth Amendment) [ARG-33(II)(v) of 2026]

AmendmentDated 20 Mar 2026No. MPERC /2026/401 dated 20.03.2026

Amends the Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2021 — Revision-II.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fifth Amendment to MPERC's 2021 regulations on cogeneration and generation from renewable sources, and it rewrites the state's Renewable Purchase Obligation (RPO) architecture. It is made under s.181 read with s.61(h) and s.86(1)(e) of the Electricity Act 2003, extends to the whole of Madhya Pradesh, and takes effect on publication in the Madhya Pradesh Gazette (p1).

Part 2 (pp1–2) touches the definitions in Regulation 2: it adds 'Adjudicating Officer', 'Bureau of Energy Efficiency' and 'Distributed Renewable Energy', replaces the definition of RPO itself, renumbers one clause and deletes two others.

Part 3 is the operative core (pp2–7). Regulation 3.1 is replaced by a year-wise obligation table running from 2024-25 to 2029-30, split into wind, hydro, distributed renewable energy, other renewable energy and a total column, and by the conditions attaching to each head — commissioning vintages for wind and hydro, the treatment of free power and of Central-Government-approved projects outside India, and a size/configuration test for distributed renewable energy with a prescribed conversion factor where generation data is unavailable. Regulations 3.1.1–3.1.8 replace their predecessors with rules on fungibility between components, exclusion of nuclear consumption, how open access consumers, captive users and distribution licensees each compute their obligation, carve-outs for waste-heat and fossil-based self-consumption, the permitted compliance routes (own consumption, RECs including under virtual PPAs, and buyout price), and aggregation for consumers under common control. Regulations 3.1.9–3.1.14 are deleted.

Parts 4–7 (pp7–8) delete Regulations 12.5–12.7, add a buyout-price route at Regulation 13.4, delete Regulation 14(B) and drop 'A' from the State Agency heading, and replace Regulation 15 wholesale: the Bureau of Energy Efficiency monitors and reports compliance through its portal, entities file certified information via BEE-accredited auditors and SLDC/MPPMCL, and shortfalls or defective reporting can be penalised by the Adjudicating Officer under s.26(3) of the Energy Conservation Act 2001.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Open access

Read with this

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document