MPERC · Madhya Pradesh Electricity Regulatory Commission

Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Third Amendment, 2023

Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021(Third Amendment) [ARG-33(II)(iii) of 2023]

AmendmentDated 26 Jul 2023No 1684/MPERC / 2023 dated 26th July 2023

Amends the Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2021 — Revision-II.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Page 2 is the operative document: the Third Amendment to the MPERC (Cogeneration and Generation of Electricity from Renewable Sources of Energy) (Revision-II) Regulations, 2021 [RG-33(II) of 2021], issued by the Commission as No 1684/MPERC/2023 from Bhopal, dated 26 July 2023. It is made under s.181 read with s.61(h) and s.86(1)(e) of the Electricity Act 2003 (p2).

Regulation 1 gives the short title, provides that the amendment takes effect from the date of publication in the Madhya Pradesh Gazette, and extends it to the whole of Madhya Pradesh (p2). Regulation 2 makes the only substantive change: it substitutes sub-clause (x)(a) of Regulation 2 of the Principal Regulations, replacing the definition of 'Entity'. An Entity is now a consumer with contracted demand or sanctioned load of 100 kilowatt or more, whether through a single connection or through multiple connections aggregating that load within the same Electricity Division of a distribution licensee, with captive consumers excluded; a proviso removes any load limitation for captive consumers (p2). Because 'Entity' is the term that fixes which consumers the Principal Regulations reach, this one substitution determines the scope of the parent regime.

Page 1 does not belong to this instrument: it is the closing portion of an amendment to Madhya Pradesh judicial service pay, pension and retirement-benefit rules, invoking the MP Judicial Service (Revision of Pay, Pension and other Retirement Benefits) Rules, 2022 (p1).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document