MPERC · Madhya Pradesh Electricity Regulatory Commission
Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations 2021 — Sixth Amendment, 2026
Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) (Revision-II) Regulations 2021 (Sixth Amendment) [ARG-33(II)(vi) of 2026]
AmendmentDated 4 Aug 2026No.1349/MPERC/2026 dated 4th August 2026
Amends the Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2021 — Revision-II.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Sixth Amendment to MPERC's 2021 regulations on cogeneration and generation of electricity from renewable sources, issued at Bhopal on 4 August 2026 as No.1349/MPERC/2026 and signed by the Commission Secretary (p3). It is a two-clause instrument. Clause 1 supplies the short title, commencement on publication in the Madhya Pradesh Gazette, and territorial extent to the whole State (p3). Clause 2 amends Regulation 3 of the Principal Regulations, 2021 (p3).
The operative change is the insertion of new sub-regulations 3.1.9 to 3.1.12 after Regulation 3.1.8. Together they create an Energy Storage Obligation: a minimum share of total energy procured to be sourced as solar/wind energy together with, or through, storage. The obligation is expressed on an energy basis and rises across four financial years from 2026-27 to 2029-30, given in a small table (p3–4; the same table also appears uncaptioned on p1).
3.1.10 says how it is measured and when it counts as satisfied: as a percentage of total electricity procurement, in energy terms, tied to the minimum renewable share already set by Regulation 3.1; and treated as fulfilled only where at least 85% of the energy stored in the Energy Storage System over a year is procured from renewable sources (p4). 3.1.11 makes the renewable-sourced storage count towards the total RPO under Regulation 3.1 (p4). 3.1.12 makes the obligation subject to periodic review in the light of pumped storage commissioning and operation, new commercially viable storage technologies and falling battery storage costs (p4).
The text supplied is only the operative body plus fragments: page 1 is the obligation table standing alone, and page 2 preserves a single heading line naming BESS, PSP, commissioning and the Energy Storage Obligation, consistent with a contents entry or clause caption rather than operative text. The Gazette date is not printed, so commencement cannot be fixed from the document itself.
Read with this
The regulation
Amendments and corrections
- Dated 16 Jan 2023Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — First Amendment, 2023
- Dated 24 Jan 2023Corrigendum Notice, 24th January 2023
- Dated 31 Mar 2023Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Second Amendment, 2023
- Dated 26 Jul 2023Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Third Amendment, 2023
- Dated 4 Mar 2025Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fourth Amendment, 2025
- Dated 20 Mar 2026Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026
Other copies of these documents (1)
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.