GERC · Gujarat Electricity Regulatory Commission

Multi-Year Tariff Regulations, 2016 — Draft

Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2016

Draft regulationDated 19 Feb 2016Notification No. __of 2016

Draft

A proposal that has since been finalised as the Multi-Year Tariff Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2016 establish a five-year multi-year tariff framework for Gujarat's regulated electricity businesses. The contents table (p1–4) lists eight chapters and annexures. Chapter 1 (p7–23) sets the title, Gujarat-wide extent, commencement from Gazette publication and a term to 31 March 2021; it applies tariff determination from 1 April 2016 and supersedes the 2011 MYT Regulations and the 2005 SLDC fees regulations. It defines core accounting, cost, availability, commercial-operation and business-separation terms, sets the scope of Commission tariff jurisdiction, and provides that norms are ceiling norms, deviations need Commission approval and an overall life-cycle tariff test, and the Commission retains inherent, relaxation, amendment and interpretation powers.

Chapter 2 (p24–37) establishes the MYT framework: a control-period ARR forecast, first-year tariff determination, annual tariff determination, truing up against audited accounts, mid-term review, and pass-through/sharing of uncontrollable and controllable gains and losses. It prescribes the MYT petition contents, filing sequence, capital investment plan, revenue forecasts and the Commission's order/rejection process. The contents table lists Chapter 3 (p38–53) on financial principles—debt-equity, capital cost, additional capitalisation, consumer contributions, return on equity, interest, depreciation, working capital, tax, rebate, delayed payment surcharge and forex variation—and Chapter 4 (p54–79) on generation tariffs, including thermal and hydro norms, annual fixed charges, energy charges, incentives, declared capacity and CDM benefit sharing. Chapter 5 (p80–87) covers intra-state transmission ARR, charges, sharing, incentives and losses. Chapter 6 (p88–92) covers SLDC fees and charges, levy and collection, grid connection applications, billing and the LDC development fund. Chapter 7 (p92–97) covers distribution wires business ARR, the allocation matrix, wheeling charges and losses. Chapter 8 (p98–104) covers retail supply tariff components, sales forecasts, non-tariff income, cross-subsidy and additional surcharge receipts, distribution losses and tariff determination. Annexure I (p105–107) is the depreciation schedule; Annexure II (p108–110) sets the transmission availability calculation procedure; Appendices I–III (p111–114) give SIL values, availability formulae and the SLDC availability certificate format.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Commencement notices and reasons

Proposed changes (drafts with no final yet)

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document