Skip to content

GERC · Gujarat Electricity Regulatory Commission

Multi-Year Tariff (Second Amendment) Regulations, 2018 — Explanatory Note — Draft

Explanatory Note for Draft GERC (Multi-Year Tariff) (Second Amendment) Regulations, 2018

Explanatory memorandum to a draftDated 25 Apr 2018

Draft

The draft has since been finalised as the Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018.

Explanatory memorandum to the Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's explanatory note for the draft GERC (Multi-Year Tariff) (Second Amendment) Regulations, 2018. It explains why the Commission proposes to change the basis on which short-term transmission charges are levied, and sets out the text it proposes to substitute into the principal regulations (p1–2).

The note recalls that the GERC (Multi-Year Tariff) Regulations, 2016 were notified under Section 181(2) of the Electricity Act, 2003 read with a range of tariff, licensing and grid sections, and under Section 32 of the Gujarat Electricity Industry (Reorganisation and Regulation) Act, 2003. It records that the Commission's Tariff Order of 31 March 2017 in Petition No. 1620/2016 set short-term transmission charges on a Rs/MW/day basis and charges for short-term collective transactions through power exchanges on a paise/kWh basis, so that bilateral and power-exchange transactions were treated differently (p1).

Stakeholders asked the Commission for uniform short-term transmission charges. GETCO, in Petition No. 1692/2017, argued that CERC's Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 apply per-kWh charges to all short-term transactions, collective or bilateral, and proposed the same treatment in Gujarat. The Commission's Tariff Order of 31 March 2018 in that petition approved Rs/kWh charges for short-term open access through power exchanges under Regulation 72 of the MYT Regulations, 2016 (p1).

The note then proposes that Regulations 72.2 and 72.3 of the principal regulations be substituted by a single Regulation 72.2, requiring short-term transmission charges — including collective transactions through power exchanges — to be determined in Rs/kWh using a formula that divides the Transmission ARR by total units wheeled, with both terms defined in the substituted text (p2).

Standard name
Multi Year Tariff Regulations
Primary topics
Transmission tariff

Read with this

The regulation

Commencement notices and reasons

Proposed changes (drafts with no final yet)

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document