Skip to content

GERC · Gujarat Electricity Regulatory Commission

Multi-Year Tariff Regulations, 2016

Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2016

RegulationDated 27 Mar 2016Published in the Gazette 29 Mar 2016Notification No. 4 of 2016

Replaced by Gujarat Multi-Year Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 21 of 72. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's principal Multi-Year Tariff framework for the five-year control period from 1 April 2016 to 31 March 2021. It is a notification under s.181(2) of the Electricity Act 2003 and s.32 of the Gujarat Electricity Industry (Reorganisation and Regulation) Act 2003, published in the Gujarat Government Gazette on 29 March 2016, and it comes into force on that date, applying to tariff determination from 1 April 2016 (pp1,5). It supersedes the GERC Multi-Year Tariff Regulations, 2011 and the GERC (Levy and Collection of Fees and Charges by SLDC) Regulations, 2005 (p5). The pages cover the preliminary chapter, definitions and general principles; the contents list maps the remaining chapters on generation, intra-state transmission, SLDC fees, distribution wires and retail supply (pp1-3).

The preliminary chapter establishes the framework's scope. Regulation 3 sets out the matters for which the Commission determines tariff, including generation supply, intra-state transmission, SLDC fees, wheeling and retail supply, and provides for separate ARR determination for distribution wires and retail supply businesses (pp13-14). Regulations 4 to 15 govern the relationship between norms and practice: norms are ceiling norms, deviations are permitted subject to conditions, and the Commission retains powers to issue orders, remove difficulties, relax provisions, interpret and amend (pp14-15).

Chapter 2 sets out the MYT framework itself. It requires a detailed MYT application covering the whole control period, annual determination and truing up, with a mid-term review in the second year (pp15-16). It specifies filing requirements, including the initial petition covering truing up for FY 2015-16 and multi-year ARR for the entire control period (p16). Regulations 20 to 24 set the trajectory for key variables, the truing-up mechanism, categorisation of controllable and uncontrollable factors, the pass-through of uncontrollable gains or losses, and the sharing of controllable gains or losses (pp18-20). Regulation 25 gives the Commission authority to determine or adopt tariff, and Regulation 26 addresses generation tariff for existing, new and own generating stations (p21).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Commencement notices and reasons

Proposed changes (drafts with no final yet)

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document