Skip to content

GERC · Gujarat Electricity Regulatory Commission

Draft Gujarat (Multi-Year Tariff) Regulations, 2021

Draft Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2021

Draft regulationDated 10 Aug 2020

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft principal MYT regulation for Gujarat. It sets the framework for the Commission to determine aggregate revenue requirements and tariffs for generation, intra-State transmission, SLDC, distribution wires business and retail supply for the five-year Control Period from April 1, 2021 to March 31, 2026 (pp7, 12, 28). It states that it supersedes the GERC MYT Regulations, 2016 and would commence on Gazette publication, applying to tariff determination from April 1, 2021 (p7).

Chapter 1 (pp7–27) contains definitions, scope, ceiling norms, deviation and general powers; Chapter 2 (pp28–41) sets the MYT filing, forecast, mid-term review, truing-up, controllable/uncontrollable factor and gain/loss sharing architecture, and routes generation, transmission, wires, retail and SLDC tariffs to later chapters. Chapter 3 (pp42–71) contains the financial principles — capital cost, additional capitalisation, consumer contributions/grants, debt-equity, return on equity, interest, depreciation, working capital, income tax, rebates, delayed payment surcharge and forex variation.

Chapter 4 (pp72–106) governs generation tariff: applicability, petitions and plans, tariff components, thermal and hydro operating norms, O&M expenses, capacity/energy charge computation, billing, CDM benefit sharing, deviation charges and backing-down compensation. Chapter 5 (pp107–118) covers intra-State transmission ARR, O&M norms, target availability, non-tariff income, sharing of transmission charges, losses and pricing. Chapter 6 (pp119–127) covers SLDC fees and charges, capital investment, O&M, non-tariff income, RLDC/WRPC and ULDC/SCADA charges, billing, grid connection and the LDC Development Fund.

Chapter 7 (pp128–137) deals with the Distribution Wires Business — ARR components, O&M, contingency reserve, allocation matrix, capital investment, non-tariff income, Other Business income, wheeling charges and wheeling losses. Chapter 8 (pp138–150) deals with retail supply — ARR components, power procurement approvals, transmission/SLDC charges, O&M, bad debts, capital investment, sales forecast, non-tariff income, Other Business income, cross-subsidy/additional surcharge receipts, distribution losses, tariff determination and FPPPA. Annexure I (pp151–153) gives the depreciation schedule; Annexure II (pp154–156) specifies transmission availability computation; Annexure III (pp157–165) contains capex approval guidelines; Appendix-I (p166) gives the SLDC availability certificate format.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Commencement notices and reasons

Proposed changes (drafts with no final yet)

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document