GERC · Gujarat Electricity Regulatory Commission
Draft Gujarat (Multi-Year Tariff) Regulations, 2021
Draft Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2021
Draft regulationDated 10 Aug 2020
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft principal MYT regulation for Gujarat. It sets the framework for the Commission to determine aggregate revenue requirements and tariffs for generation, intra-State transmission, SLDC, distribution wires business and retail supply for the five-year Control Period from April 1, 2021 to March 31, 2026 (pp7, 12, 28). It states that it supersedes the GERC MYT Regulations, 2016 and would commence on Gazette publication, applying to tariff determination from April 1, 2021 (p7).
Chapter 1 (pp7–27) contains definitions, scope, ceiling norms, deviation and general powers; Chapter 2 (pp28–41) sets the MYT filing, forecast, mid-term review, truing-up, controllable/uncontrollable factor and gain/loss sharing architecture, and routes generation, transmission, wires, retail and SLDC tariffs to later chapters. Chapter 3 (pp42–71) contains the financial principles — capital cost, additional capitalisation, consumer contributions/grants, debt-equity, return on equity, interest, depreciation, working capital, income tax, rebates, delayed payment surcharge and forex variation.
Chapter 4 (pp72–106) governs generation tariff: applicability, petitions and plans, tariff components, thermal and hydro operating norms, O&M expenses, capacity/energy charge computation, billing, CDM benefit sharing, deviation charges and backing-down compensation. Chapter 5 (pp107–118) covers intra-State transmission ARR, O&M norms, target availability, non-tariff income, sharing of transmission charges, losses and pricing. Chapter 6 (pp119–127) covers SLDC fees and charges, capital investment, O&M, non-tariff income, RLDC/WRPC and ULDC/SCADA charges, billing, grid connection and the LDC Development Fund.
Chapter 7 (pp128–137) deals with the Distribution Wires Business — ARR components, O&M, contingency reserve, allocation matrix, capital investment, non-tariff income, Other Business income, wheeling charges and wheeling losses. Chapter 8 (pp138–150) deals with retail supply — ARR components, power procurement approvals, transmission/SLDC charges, O&M, bad debts, capital investment, sales forecast, non-tariff income, Other Business income, cross-subsidy/additional surcharge receipts, distribution losses, tariff determination and FPPPA. Annexure I (pp151–153) gives the depreciation schedule; Annexure II (pp154–156) specifies transmission availability computation; Annexure III (pp157–165) contains capex approval guidelines; Appendix-I (p166) gives the SLDC availability certificate format.
Read with this
The regulation
- Dated 27 Mar 2016Multi-Year Tariff Regulations, 2016
Amendments and corrections
- Dated 1 Dec 2016Multi-Year Tariff Regulations, 2016 — First Amendment, 2016
- Dated 14 Aug 2018Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018
Commencement notices and reasons
Proposed changes (drafts with no final yet)
- Dated 4 Sep 2023Multi-Year Tariff Regulations, 2023 — Draft
- Dated 10 Aug 2020Explanatory memorandum: Draft Multi Year Tariff Regulations, 2021 — Explanatory Memorandum
Earlier drafts
- Dated 19 Feb 2016Multi-Year Tariff Regulations, 2016 — Draft
- Dated 30 Aug 2016Explanatory Note for Draft Multi-Year Tariff (First Amendment) Regulations, 2016
- Dated 26 Apr 2018Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018 — Draft
- Dated 25 Apr 2018Explanatory memorandum: Multi-Year Tariff (Second Amendment) Regulations, 2018 — Explanatory Note — Draft
4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.